– 38 –
SPEC
Ò
Support the throttle cables with the T-bar located
behind the cable guide.
Ó
Pass the throttle cables under spark plug leads
#1, #2, #3, and #4, and the wire harness, head-
light lead, main switch lead, immobilizer lead,
right handlebar switch lead, and left handlebar
switch lead. Install the thermostat, heat protec-
tor, throttle cables, spark plug leads, wire har-
nesses, and air cut valve under the cable guide
in the respective order.
Ô
To the left slit of the plate
1
2
3
4 5 6
7
8
9
0
A
B
C
D
E
F
G
H
D
C
Ô
È
É
Ê
Ë
Ì
Í
Î
Ï
Ð
Ñ
Ò
Ó
I
CABLE ROUTING
Содержание 2003 FJR1300
Страница 1: ...2003 FJR1300 R FJR1300A R 5JW1 AE4 SUPPLEMENTARY SERVICE MANUAL ...
Страница 2: ......
Страница 61: ... 53 CHAS INSTALLING THE BEARING 1 Install bearing 1 a 3 5 4 5 mm b rear wheel a b 1 REAR WHEEL AND BRAKE DISC ...
Страница 159: ......
Страница 160: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...