pouring it into the headstock. There is a level site glass located under the spindle
cover. The headstock reservoir holds approximately 9.5 liters for the SLX 1630. Fill
the headstock with Mobil DTE 24 oil or an equivalent grade.
The headstock gearbox oil must be drained and flushed after the first 150 hours
of operation. A small percentage of kerosene may be added to the gearbox to
flush out dirt and sediment. Operate the machine for several minutes without
load so that the flushing oil can circulate through the reservoir and remove the
dirt. The flushing oil must then be drained and new oil added. Do not flush
with solvents that will soften the paint. Thereafter, the oil should be flushed
and drained every 1500-2000 hours of operation.
Figure 23
SLX 1630 Lubrication