www.xolta.com
11
• Fix the battery base on the foundation using concrete
10 mm expansion bolts.
Allowed cable
routing space
845 mm
800 mm
360 mm
150 mm
Bolt holes for fixing the base
Metal guides on
the base of the rack
Mounting the battery base:
• The foundation must be level, this is to insure a nice visual
look and best performance from the system.
• Height of foundation should be minimum 150mm more if
area is prone to flooding.
• The foundation must be level with a plain surface to ensure
best performance of the system
• XOLTA can provide a standard concrete plinth for single
rack installations.
Allowed cable
routing space
Min. 150mm
Foundat
ion must
be level (MAX 0,1
O)
?
MECHANICAL INSTALLATION OF THE BATTERY: