Preparation before installation:
Lifting tool – The system can be moved by the
following methods
• Crane
• Forklift
Materials included:
• Battery rack (1)
• 20 battery boxes (installed)
• Inverter (installed)
• Battery Protection Unit (installed)
• Base
• keys
• Bolts (10mm)
• Base frontplate
Materials to be provided by the installer:
• Concrete bolts ( mounting the base on foundation
• Inverter Power cable (MAX 35 mm
2
)
• Control power cable (MAX 2,5 mm
2
)
• Patchkabel (MIN CAT6)
• Foundation
PREPARATION BEFORE INSTALLATION:
Before you install a battery, you must be registered as an installer with us.
Contact at [email protected] or +45 7060 2017