© 2023 by XOLTA
18
4
5
6
7
8
3 2 1
Connecting points inside the
battery rack:
4-8:
Inverter power cables
1-3:
BPU control power
9:
Ethernet connection
10:
Cable entry plate
NOTE!
Please check phase order:
L1, L2, L3 - 400V
9
10
Install bolts in the base, as show in the illustration below.