Copyright | C6AM User Manual, Version 1.2.2
25
Figure 4.6.2
WARNING
Mortal danger due to electrocution!
Contact with high power parts can result in electric shock, burns or death. Before
working, please put on the required protection equipment such as protective
clothing and gloves:
- Disconnect the system from the power supply.
- Make sure that the power supply is disconnected before and while working on
installation.
After opening the front door and removing the cover, connect the 3 phase cables L1,
L2, L3 and the neutral conductor N as well as the PE protective conductor to the
busbar. Then check the connection carefully. Tighten all terminal screws to complete
the installation of the power cables. The screw size and torque requirements are
shown below in table 4.6.1.
Type
Size of screws
Torque
tools
C6AM 60kW
C6AM
120kW
C6AM
150kW(480V
)
L1/L2/L3/N M10x20mm
PE M8x16mm
M8: 15-20N.m
M10: 25-30N.m
13mm socket for M8;
17mm socket for M10
C6AM
95kW(208V)
L1/L2/L3/N M10x20mm
PE M8x16mm
M8: 15-20N.m
M10: 25-30N.m
13mm socket for M8;
17mm socket for M10
Table 4.6.1