Operation
2–36
152607
8. Fill out the
Connection - Telephone Fault Configuration
Information in the
form shown in Figure 2-25.
9. Click on the Telephone Configuration sub-menu to continue.
10. Fill out the
Connection - Telephone Configuration
Information in the form
shown in Figure 2-26.
11. Once the information is complete, click the
O
K
button to accept the changes
and return to the GUI main menu.
Figure 2-25
Connection Configuration Screen - Telephone Fault Configuration
Form Tab
Fill out all the
required
information
on this form.
Sub-menus
Figure 2-26
Connection Configuration Screen - General
Form Tab
Fill out all the required
information on this
form.
Sub-menus
Click on the OK
button to save the
changes and
return to the GUI
Main Menu.
Содержание PV225S-480-P
Страница 1: ...PV225S 225 kW Grid Tied Photovoltaic Inverter PV225S 480 P Operation and Maintenance Manual...
Страница 2: ......
Страница 3: ...PV225S 225 kW Grid Tied Photovoltaic Inverter Operation and Maintenance Manual...
Страница 8: ...vi...
Страница 14: ...xii...
Страница 22: ...xx...
Страница 78: ...2 38...
Страница 79: ...Computer Communications with the PV225S 152607 2 39...
Страница 80: ...Operation 2 40 152607...
Страница 88: ...3 8...
Страница 102: ...4 14...
Страница 107: ...Maintenance Safety 152607 5 5 Figure 5 3 PV Terminal Locations PV NEGative K2 6T3 PV POSitive S2 6 PV GrouND TB4...
Страница 110: ...5 8...
Страница 115: ...Appendix A Schematics 152607 A 5 Figure A 1 Electrical Diagram sample...
Страница 122: ...WA 4...
Страница 125: ......