Manual State Transitions
State conditions can also be transitioned manually. Refer to “Commanding Goal
State Changes” on page 2–20 for instructions on commanding PV225S goal states
for manual transitions.
Shutdown
→
Matrix Test
→
Shutdown
1. Turn the
O
N
/O
FF
switch to the
O
FF
position.
2. Command the PV225S to the Matrix Test.
3. After completing the Matrix Test, command the PV225S to Shutdown.
If the
O
N
/O
FF
switch is turned to
O
N
while the PV225S is in the Matrix Test state,
the PV225S will transition to Shutdown.
Power Tracking
→
Manual Current
→
Power Tracking or Shutdown
1. Verify the PV manual current parameter (
I Manual %
) is set to the desired
percent of rated.
2. Command the PV225S to Manual Current mode from the operator interface
keypad. While in the manual current mode, the user may change the PV
manual current parameter.
However, the user may demand greater current
than the capacity of the PV array. If this causes the PV voltage to drop below
the minimum operating voltage (300 Vdc), the PV225S will transition to
Shutdown.
3. To exit the Manual Current mode, the user must manually command the
PV225S to Power Tracking.
Automatic State Transitions
State conditions can also be transitioned automatically. Refer to “Commanding
Goal State Changes” on page 2–20 for instructions on commanding PV225S goal
states.
Shutdown
→
Power Tracking
→
Shutdown
1. The
O
N
/O
FF
switch must be turned to the
O
N
position.
2. Once the PV voltage exceeds the PV voltage start set point (
PV V Start
) the
PV225S will start a wake-up timer (
PV T Start
).
a) If the PV voltage remains above the PV start voltage set point for the
duration of the wake-up timer, the PV225S will transition to Power
Tracking.
b) If the PV power drops below the PV power stop set point, (
PV P Stop
)
the PV225S will start a PV sleep timer (
PV T Stop
).
c) If the PV voltage and power remain below their respective setpoints for
the duration of the sleep timer, the PV225S will transition to Shutdown.
Содержание PV225S-480-P
Страница 1: ...PV225S 225 kW Grid Tied Photovoltaic Inverter PV225S 480 P Operation and Maintenance Manual...
Страница 2: ......
Страница 3: ...PV225S 225 kW Grid Tied Photovoltaic Inverter Operation and Maintenance Manual...
Страница 8: ...vi...
Страница 14: ...xii...
Страница 22: ...xx...
Страница 78: ...2 38...
Страница 79: ...Computer Communications with the PV225S 152607 2 39...
Страница 80: ...Operation 2 40 152607...
Страница 88: ...3 8...
Страница 102: ...4 14...
Страница 107: ...Maintenance Safety 152607 5 5 Figure 5 3 PV Terminal Locations PV NEGative K2 6T3 PV POSitive S2 6 PV GrouND TB4...
Страница 110: ...5 8...
Страница 115: ...Appendix A Schematics 152607 A 5 Figure A 1 Electrical Diagram sample...
Страница 122: ...WA 4...
Страница 125: ......