U
SER
M
ANUAL
C
OMMISSIONING
28
4.5
Connecting the X
ORAYA
Z7 to the measuring environment
This section describes how to connect the X
ORAYA
Z7 to the measuring
environment.
CAUTION
Device damage due to incorrect connection sequence
The incorrect connection sequence can lead to abnormal
behaviour or destruction of the X
ORAYA
Z7.
According to the numbering of the subsections,
connect the interfaces first and then the power
supply.
Please note the correct connection sequence from
top to bottom within the subsection.
4.5.1
Interfaces
Observe pin assignments
Please note the port pin assignments when connecting
the X
ORAYA
Z7 with the measuring environment. Wrong
pin assignments lead to measurement errors.
Please note the following sequence:
Connect the data cables of all data buses to be monitored in the
measuring environment.
Connect the data cables to the appropriate X
ORAYA
Z7 ports.
Wherever possible, tighten the connector screws on the X
ORAYA
Z7 and
in the measuring environment.
The X
ORAYA
Z7 is connected to all data buses to be monitored.
Loss of data due to port disconnections
To avoid data loss, never disconnect the X
ORAYA
Z7
during the current recording from connected data buses.
Furthermore, make sure that all connectors are firmly
attached and the screws are tightened.
Содержание XORAYA Z7
Страница 1: ...User Manual XORAYA Z7 Edition 1 1 4 December 2018 ...
Страница 45: ...USER MANUAL XORAYASUITE 45 System Settings Network 1 Open MAC IP assignments ...
Страница 70: ...USER MANUAL XORAYASUITE 70 RS 232 ...
Страница 189: ......