Covering up the fire:
Before the wall surrounding the ST900 is lined, the fire must be covered up and sealed to
prevent plaster board and plaster dust from getting into the fire. It is recommended that the
packaging supplied with the fire is used to achieve this.
18.0
Commissioning the Fire:
After the cladding and finishing processes are completed, the gasfitter must return to the
site to run the fire for a minimum of 20 minutes and finally assemble and fit the facia.
18.2
Fitting the stone frame:
Take care when handling the facia and get help if necessary. The Facia Brackets have
been fastened to the facia in flat-pack form to help protect the facia during transport.
Remove the 8 screws shown below holding the brackets in place.
To assemble the two brackets removed in the previous step, use the 8x screws removed to
re-fasten the brackets to the facia as shown below. Position the brackets with the flange
facing outwards, and the hooks facing the bottom of the facia [Identify the bottom of the
facia by the large cut-out shown below].
Содержание 1200 Limestone
Страница 17: ...630140_1 XFIRE_1200_GB_Manual_R emotion...
Страница 18: ...630140_1 XFIRE_1200_GB_Manual_R emotion...
Страница 39: ...630140_1 XFIRE_1200_GB _Service_R emotion...
Страница 40: ...630140_1 XFIRE_1200_GB _Service_R emotion...