SETUP & OPERATION
Planer/moulder setup
3
3-1
EGdoc121819
SECTION 3 SETUP & OPERATION
3.1
Planer/moulder setup
IMPORTANT!
Before starting to use the planer/moulder you have to
meet the following conditions:
Set up the planer/moulder on firm, level ground and level the planer/moulder. Secure the
planer/moulder to the ground to prevent moving during operation. A cement pad with 8-10
mm diameter anchor bolts is recommended.
Indoors the planer/moulder can be operated with the sawdust collection system only.
The planer/moulder can not be operated when it is raining/snowing and in case of rain or
snow the sawmill must be stored under roof or indoors.
The planer/moulder can be operated in temperature range from -15
o
C to 40
o
C only.
The illumination at the operator's position should be at least 300lx
1
.
The planer/moulder’s operator position and E-Stop safety buttons location are shown
below.
See table 3-1.
Have a qualified electrician install the power supply (according to EN 60204
Standard). The power supply must meet the specifications given below.
1.
Light source can not cause stroboscopic effect.
3-Phase
Volts
Fused Disconnect
Switch
Suggested Wire Size
400 VAC
14 A
1.5 mm
2
up to 15 m long
TABLE 3-1
!
E-STOP
Содержание MP160