MAINTENANCE
Drive Belt Tension Adjustment
4
4-2
doc121819
MAINTENANCE
Feed roller drive chain
Two slide rods and trapezoidal thread
Cast iron table
4.
Every 50 hours check that all screws and bolt connections are tightened. Check that cables and
electrical connectors are in good condition.
4.4
Drive Belt Tension Adjustment
4.4.1 Top cutter drive belt tension adjustment
Check top cutter drive belt tension after first 20 hours of operation and every 50 hours of operation
thereafter.
1.
Unbolt and remove cutter drive belt cover (A).
2.
Check top cutter drive belt for wear and tension. Replace belt as needed.
3.
To tension the drive chain, loosen four motor plate mounting bolts (B).
FIG. 4-1
50
50
A
B
C
Содержание MP160
Страница 2: ......