
Setup & Operation
3
3-1
doc020719
Setup & Operation
SECTION 3 SETUP & OPERATION
3.1. Sawmill Setup
IMPORTANT!
Before starting to use the sawmill you have to meet the
following conditions:
Set up the sawmill on firm, level ground and level the sawmill. Secure the sawmill to the
ground to prevent moving during operation. A concrete foundation or pads (rated to support
31 T/m
2
at each sawmill foot position) and 16mm anchored bolts are recommended.
Under roof, the sawmill should always be operated with the sawdust collection system.
The sawmill can’t be operated outdoor when it is raining/snowing and in case of rain/snow
the sawmill must be stored under roof or indoor.
The sawmill can be operated in temperature range from -15
o
C to 40
o
C only.
The illumination at the operator's position should be at least 300lx
1
.
The sawmill operator’s position is shown below.
Have a qualified electrician install the power supply (according to EN 60204 Standard). The
power supply must meet the specifications given in the table below.
IMPORTANT!
When starting the machine for the first time, check that
main motor rotation direction is as indicated by the arrow located on
1.. The light source can not cause stroboscopic effect.
3-Phase
Volts
Fuse disconnect
Suggested Wire Size
400 VAC
16 A
2,5 mm
2
to length of 15m
!
150189a
!
Содержание LT15SC M2 E11S
Страница 1: ......
Страница 2: ......
Страница 120: ...Track Roller Distance Adjustment 6 6 17 HDSdoc020719 See Figure 6 18 FIG 6 18 0 5 mm 1 2 3...