background image

Commisioning WSC 304 01 

____________________________________________________________________________ 

Smoke control unit - WSC 304 01 

16 

 

7)

8)

d) If the actuators were open, they will automatically close after 2 minutes.

9)    

10)

d) The Smoke trip has priority.

Function 

description 

 Operating elements and fuse review

wiring diagram

Automatic detectors

Emergency power supply test

Aktivation of internal check

Wind/rain detector

a) Spray test aerosol on the detectors.
b) The actuators move open through to the end position. The red LED in the detector, the red alarm LED (also 

in the control unit) and the permanent acoustic signal in the operating panel are ON.

c) While running, press the Closed button at the ventilation button, then press both buttons, the actuators 

must neither close nor stop!

d) Press the reset/Closed button in the operating panel. The actuators close through to the end position. The 

ventilation function is released again. The red alarm LED (also in the control unit) and the signal generator 
are OFF.

a) Remove the mains fuse from the control centre. Adhere to the relevant regulations!
b) The green mains and operating LED's are OFF, the yellow accumulator Led is flashing (control unit in the 

accumulator mode).
The malfunction message at the break glass unit is ON.

c) The ventilation buttons are deactivated.

e) Test the SHE trip and reset/closed as described under 5).
f)

Refit the mains fuse.

g) The green mains and operating LED's are ON, the yellow accumulator LED is OFF. The malfunction 

message at the break glass units is OFF.

       a) Disconnect the smoke vent unit from the mains and back-up batteries
       b)   Exchange the blind jumper J2 for active jumper J1
       c) Reconnect the smoke vent unit to the mains and back-up batteries     
       d) The operation LED flashes app. 10 seconds to control the activation

a) Open the actuators with the ventilation button.
b) Wet the rain sensor, the actuators will fully close, the green wind/rain LED in the control centre is ON.
c) While running, press the Open button at the ventilation button, then press both buttons, the actuators must 

neither open nor stop!

When the start-up was successful, then close the doors of the break glass units and of the control unit.

If the start-up was unsuccessful (error with one of the test run processes), please refer to the chapter 

and

. If necessary, check the wiring in accordance with the 

.

 

 

 

 

 

Содержание WSC 304 01

Страница 1: ...Commisioning Maintenance www WindowMaster com WindowMaster A S Skelstedet 13 2950 Vedb k Danmark Tel 45 4567 0300 Fax 45 4567 0390 WindowMaster GmbH Zum Bache 4 32549 Bad Oeynhausen Deutschland Tel 49...

Страница 2: ...onnection Leave the insulation of the power supply cable in place up to the mains terminal Manufacturer s declaration The central control system is exclusively designed for the automatic closing of sm...

Страница 3: ...review WSC 304 01 ____________________________________________________________________________ Smoke control unit WSC 304 01 3 Operating Accu Motor Alarm Mains Motor Smoke det SHE switch SHE display...

Страница 4: ...reak glass unit are lit The yellow malfunction LED in the break glass unit flashes Resetting a trip caused by high temperature The smoke extraction system can be closed again by pressing the Reset but...

Страница 5: ...ter ventilation OPEN or ventilation STOP This function is not operative if the setting potentiometer is on the right hand stop Wind rain CLOSE The actuators close when the wind rain sensor has tripped...

Страница 6: ...must be specially made in the production by using a special software ASV CLOSE When ASV CLOSE is tripped all actuators automatically CLOSE An acoustic alarm signal sounds continuous sound in the break...

Страница 7: ...SW2 SW 2 1 ON The smoke control system trips by a malfunction signal from the motor smoke detector or break glass unit SW 2 1 OFF The smoke control system does not trip by a malfunction signal The ma...

Страница 8: ...over contact max load 60V 1A with 3 pole connection terminal for potential free transmission to the BMS panel etc 2 pole connection terminal for 2 wire BUS cable for the feedback of malfunctions in c...

Страница 9: ...r the installation position Open central control and remove the housing top section door from the housing bottom section Fasten the housing bottom section in the wall cut out cut out dimension 335 x 3...

Страница 10: ...ble network for smoke ventilation systems Cable system ends at the interface junction box for the actuator The flexible heat resistant connection cable of the smoke ventilation system actuator is part...

Страница 11: ...Cable plan ____________________________________________________________________________ Smoke control unit WSC 304 01 11...

Страница 12: ...Standard wiring diagram __________________________________________________________________________ Smoke control unit WSC 304 01 12 WLA 330 WLA331 WSA 300 WSA 310...

Страница 13: ...Various wiring diagrams ____________________________________________________________________________ Smoke control unit WSC 304 01 13...

Страница 14: ...Various wiring diagrams ____________________________________________________________________________ Smoke control unit WSC 304 01 14...

Страница 15: ...e the protection film from one face of the supplied foam rubber Glue each foam rubber to the bottom side of the accumulators Connect the accumulators to the black accumulator bridge according to the w...

Страница 16: ...relevant regulations b The green mains and operating LED s are OFF the yellow accumulator Led is flashing control unit in the accumulator mode The malfunction message at the break glass unit is ON c T...

Страница 17: ...ystem Check fastening and clamping screws for firm seating Carry out a test run of the entire system see chapters Start up and Test Run Only have defective units repaired in our factory Only install o...

Отзывы: