Installation
Installation with 25 mm (0.98") installation frame
01750058390 G
ProCash 2050xe USB - Installation Guide
97
Mounting structure for installation on screed
CE
N
UL
(m
in
. 1.57")
min. 40
25
(0
.98")
min. 125
(min. 4.92")
*
2
4
6
7
1
3
8
5
1 Safe
5 Screed
2 Mounting set for safe
6 Concrete
3 Tear-off sensor
7 Mounting set for installation frame
4 Installation frame
8 Top surface of finished floor
*
The overall drilling depth depends on the structural conditions. The
threaded rods must be anchored at least 125 mm (4.92") in the load-
bearing concrete.
Excess lengths must be shortened correspondingly or, if necessary in
case of deeper floor anchorages, be replaced by equivalent threaded
rods.
Содержание ProCash 2050xe USB
Страница 1: ...Installation Guide ProCash 2050xe USB Self Service Systems ...
Страница 3: ...Edition June 2010 ProCash 2050xe USB Installation Guide ...
Страница 18: ...Introduction 6 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 98: ...Transport path requirements Planning the Installation 86 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 166: ...Start up Installation 154 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 182: ...Shortening the cables Installing the Remote Status Indicator 170 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 200: ...Environmental protection Appendix 188 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 201: ...01750058390 G ProCash 2050xe USB Installation Guide Notes ...
Страница 202: ...Published by WINCOR NIXDORF International GmbH D 33094 Paderborn Order No 01750058390 G 2 GB ...