Storage if construction work is not yet complete
Planning
the
Installation
34
ProCash 2050xe USB - Installation Guide
01750058390 G
Storage if construction work is not yet
complete
i
If interior construction work is not complete when installation is
planned, the device must be protected from damage caused by
building dust. You may use the plastic packing of the system for this
purpose.
Space required for operation and
maintenance
The following two illustrations show the necessary operation and maintenance
space for devices with a 35 mm (1.38") tunnel and those with a 60 mm (2.36")
tunnel.
Ventilation area
Additional operation and maintenance space, right or left
Operation and maintenance space
Additional space required for the installation (for reaching the
fastening screws in the safe).
1 Wall
Содержание ProCash 2050xe USB
Страница 1: ...Installation Guide ProCash 2050xe USB Self Service Systems ...
Страница 3: ...Edition June 2010 ProCash 2050xe USB Installation Guide ...
Страница 18: ...Introduction 6 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 98: ...Transport path requirements Planning the Installation 86 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 166: ...Start up Installation 154 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 182: ...Shortening the cables Installing the Remote Status Indicator 170 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 200: ...Environmental protection Appendix 188 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 201: ...01750058390 G ProCash 2050xe USB Installation Guide Notes ...
Страница 202: ...Published by WINCOR NIXDORF International GmbH D 33094 Paderborn Order No 01750058390 G 2 GB ...