Installation with 222 mm (8.74") installation frame
Installation
118
ProCash 2050xe USB - Installation Guide
01750058390 G
Mounting structure
CE
N
UL
2
3
4
6
5
1
8
7
222 (8.74")
min. 40
(min. 1.57")
*
min. 125
(min. 4.92")
1 Safe
5 Mounting set for safe
2 Tear-off sensor
6 Mounting set for installation frame
3 Screed
7 Top surface of finished floor
4 Concrete
8 Installation frame
*
The overall drilling depth depends on the structural conditions. The
threaded rods must be anchored at least 125 mm (4.92") in the load-
bearing concrete.
Excess lengths must be shortened correspondingly or, if necessary in
case of deeper floor anchorages, be replaced by equivalent threaded
rods.
Содержание ProCash 2050xe USB
Страница 1: ...Installation Guide ProCash 2050xe USB Self Service Systems ...
Страница 3: ...Edition June 2010 ProCash 2050xe USB Installation Guide ...
Страница 18: ...Introduction 6 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 98: ...Transport path requirements Planning the Installation 86 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 166: ...Start up Installation 154 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 182: ...Shortening the cables Installing the Remote Status Indicator 170 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 200: ...Environmental protection Appendix 188 ProCash 2050xe USB Installation Guide 01750058390 G ...
Страница 201: ...01750058390 G ProCash 2050xe USB Installation Guide Notes ...
Страница 202: ...Published by WINCOR NIXDORF International GmbH D 33094 Paderborn Order No 01750058390 G 2 GB ...