background image

7

OPM-115

REV A

be found on the WINPOWER data tag. When the M-Spec is present, 

supplemental inserts will accompany this standard manual providing 

information about the special equipment and features installed. The 

standard model numbering key that can be used along with the data 

tag information and/or M-Spec supplements to determine the generator 

set’s ratings and specifications.

D

D = Diesel

X

X = Prime/Switchable Voltage

175

Generator Output Rating in kW

F

Engine Manufacturer: F = FPT

4

Number of Generator Poles

-

Base Unit - Options Separator

X

See ES-503 OR ES-504

A

HOUSING TYPE

A = Sound Attenuated/Weather Protective

* = No Housing

M

Fuel Tank Size: S = Small; M = Medium; L = Large;

None

T

T = Trailer; * = None

D

Battery Charger Options

A = 12V/.75A; B = 12V/3.5A; C = 12V/6A; D = 12V/10A;

E = 12V/6A NFPA; F = 12V/10A NFPA; G = 24V/3.5A;

H = 24V/10A; I = 24V/10A NFPA; J = 12V/2A

TRAILER/HOUSING

These switchable voltage generators are normally shipped fully  

enclosed & mounted on a trailer. The size of the trailer may vary by 

both model and fuel tank size requirements. All the trailers are DOT 

approved and you should receive a certificate of origin with each unit. 

This will allow you to register the equipment and obtain tags from your 

state. If you should encounter any problems registering the trailer, 

contact the WINCO Service Dept at 507-357-6831.

AUTOMATIC TRANSFER SWITCH

A wall mounted ASCO 300 Automatic Transfer Switch (ATS) designed 

for inside or outside installation. The transfer switch is UL1008 

approved. A fourteen day electronic exerciser circuit is installed

in the ATS as standard equipment. The ATS also contains the power 

failure sensing circuitry necessary to start and stop the engine 

generator set. The transfer switch is also equipped standard with a 3 

second start delay, and a 15 second transfer delay to allow the engine 

to warm up before transferring the load to the generator. When the line 

power is restored the ATS has a 5 minute transfer delay to allow the 

incoming utility to stabilize before transferring back to line power and 

then an additional 1 minute engine cool down delay before the engine 

shuts down. Read and understand the ATS owners manual before 

installing, servicing or operating the transfer switch.

PREPARING THE UNIT

UNPACKING

1. As you receive your unit, it is critical to check it for any damage. If

any damage is noted, it is always easiest to refuse the shipment and

let WINCO take care of the freight claim. If you sign for the unit, the

transfer of the ownership requires that you file the freight claim

2. Before proceeding with the preparations of your new generator

for operation, take a couple of minutes to ensure the unit you have

received is the correct model and review the specification pages in this

manual to ensure that this unit meets your job requirements.

CAUTION: EQUIPMENT DAMAGE:

This unit is shipped with oil and a 50/50 mix of coolant. Be sure to 

check all fluid levels before operating. See engine manufacturer’s 

instruction manual for recommended oil requirements before initial 

starting.

Once generator set is on-site:

After inspecting the engine-generator for external, physical damage, 

locate and check the following items packed with the unit:

a. Installation and Operator’s Manual.

b. Engine manufacturer’s instruction manual.

c. Battery hold-down brackets & hardware.

d. Unit components or accessory items shipped loose for on-site

installation.

e. Optional accessories.

LIFTING THE GENERATOR SET

NOTICE: PERSONAL INJURY:

To prevent injury to persons or equipment, observe the following 

guidelines when lifting the generator:

Due to the different designs, configurations, options, weights, site 

conditions, and available material handling equipment, specific lifting 

instructions are not provided for each individual generator set model. 

General guidelines provided are applicable to the entire generator 

line. It is the responsibility of the installing party to follow the lifting 

equipment’s operator’s manual to prevent injury to personnel and 

damage to the generator. Smaller generator sets may not require use 

of overhead lifting equipment and may be placed on the pad with basic 

material handling equipment, i.e. a forklift.

CAUTION:

Do not attempt to lift the generator set by the means of the lifting eyes 

on the engine or generator end. These lifting points are only for the use 

during the manufacturing process and are designed for lifting of the 

individual generator set components.

WARNING:

 

NEVER attempt to lift the fuel tank filled with fuel. Sloshing of the 

fuel can cause a shift in the balance of the fuel tank, making for a 

DANGEROUS, unbalanced lifting load. If the generator was shipped on 

the fuel tank, use the lifting points located on the fuel tank to move the 

entire generator set into place. DO NOT PLACE FUEL IN THE TANK 

PRIOR TO LIFTING.

Содержание DX100F4

Страница 1: ...RT 5 9 6 216 5 9 51 6 5 37 21 7 25 1 7 0 12 3 57 180 5 6 5 37 21 9 2 1 1 1 7 1 5 725 8 6 5 0 66 0 5 5 77 5 7 2 7 7 867 6 67 6 3 67 9 81 76 1 5 211 7 2 7 7 50 1 2 6 77 5 5 5 7 9 03 286 1 167 7 2 1 1 51...

Страница 2: ...fully read and follow the operating instructions in this manual Should you experience a problem please follow the Troubleshooting Tables near the end of this manual The warranty listed in the manual d...

Страница 3: ...nal word is to be limited to the most extreme situations WARNING WARNING indicates a potentially hazardous situation which if not avoided could result in death or serious injury CAUTION CAUTION indica...

Страница 4: ...5 1D or 2D EN590 or equivalent Oil Type SEE LUBRICATION SECTION Oil Capacity 17 9 Quarts Cooling System 50 50 mix DX130F4 Generator Wattage 109 000 130 000 123 000 130 000 kVa 109 162 154 102 Volts 12...

Страница 5: ...120 240 277 480 Phase Three Three Three PF 80 80 80 Amps 1215 1051 526 CB Size 800 800 800 Hertz 60 60 60 Engine Model FPT C13 TTE3X 13L Starting System 24 Volt Muffler Standard Fuel Consumption full...

Страница 6: ...s phase Excitor Stator Resistance 18 0 ohms Excitor Rotor Resistance 0 068 ohms phase cycles set points and signal output capabilities are possible Consult factory for procedure and passwords NOTICE T...

Страница 7: ...t for any damage If any damage is noted it is always easiest to refuse the shipment and let WINCO take care of the freight claim If you sign for the unit the transfer of the ownership requires that yo...

Страница 8: ...ine wear and shorten its useful life COOLANT Before starting the engine check the coolant level in the radiator If it is low refill as specified in the engine manufacturer s maintenance instructions T...

Страница 9: ...d state The battery can be left on this mode indefinitely During this mode the green LED will be on constantly This charger is mounted under the customer connection on the control side of the generato...

Страница 10: ...eptacles A C B D E A C ELECTRICAL CONNECTIONS NOTICE CLASS 1 WIRING METHODS ARE TO BE USED FOR ALL FIELD WIRING CONNECTIONS TO TERMINALS OF A CLASS 2 CIRCUIT All wiring must be completed in accordance...

Страница 11: ...110 Standards This feature meets the annunciations requirements in applications requiring NFPA 110 level one protection DC INTERCONNECTIONS TO THE ATS WARNING Be sure Engine Generator is in the OFF p...

Страница 12: ...RESET button pressed to reset the module The icon will be flashing in the display SELECTING THE CORRECT VOLTAGE A variety of three phase voltages are available from the three position selector switch...

Страница 13: ...come on Note There is no start delay in this mode of operation 2 Press and release the green START ENGINE button The DSE 7310 MKII will send a start signal to the ECU on the engine The engine ECU wil...

Страница 14: ...ning light Simply reset the ATS start over Once you have completed testing of the ATS be sure you ALWAYS leave the system in the standby mode unless servicing the unit For standby operation press the...

Страница 15: ...tween these to leads must be between 190 264 Center tapped on 480 Volt LED Indicator Light FITTING AND OPERATING 2006 3 TD_AS440 AVR_03 09_04_GB SUMMARY OF AVR CONTROLS CONTROL FUNCTION DIRECTION VOLT...

Страница 16: ...HHN THHW THW 2 XHH XHHW XHHW 2 ZW 2 SIZE AWG OR KCMIL Wire Type RHW THHW THW THWN XHHW USE Wire Type TBS SA SIS THHN THW 2 THWN 2 RHH RHW 2 USE 2 XHH XHHW XHHW 2 ZW 2 44 57 75 88 101 114 132 154 176 2...

Страница 17: ...17 OPM 115 REV A SELECTOR SWITCH WIRING DIAGRAM DX90 DX130...

Страница 18: ...18 OPM 115 REV A DX175...

Страница 19: ...19 OPM 115 REV A DX250...

Страница 20: ...20 OPM 115 REV A DX90F4 DX130F4 DSE 7310 MKII WIRING DIAGRAM...

Страница 21: ...57 67 57 1 1 77 77 1 5 7 50 1 2 6 211 725 211 725 66 86 86 86 86 86 36 4 25 46 53354 6 5 1 1 6 5 1 1 1 1 1 36 32 5 6 7 66 0 5 1 6723 6 7 9 5 92 7 8670 17 5 267 7 9 5 4 88 4 2 22 17 02 8 7 50 1 2 803...

Страница 22: ...AND LOW WYE THREE PHASE LOW WYE 120 208 VOLTS THREE PHASE HIGH WYE 277 480 VOLTS THREE PHASE HIGH WYE 277 480V THREE PHASE LOW WYE 120 208V THREE PHASE DELTA 120 240 VOLTS THREE PHASE AC WIRING DELTA...

Страница 23: ...23 OPM 115 REV A ENGINE WIRING HARNESS DX90F4 DX130F4 DX175F4 DX350F4...

Страница 24: ...or 1000 hours which ever occurs first from date of purchase In no event is WINCO liable for incidental or consequential damages Note Some states do not allow limitation on the duration of implied warr...

Отзывы: