3.
Wieland Electric | BA000349 | 05.2007
3 |
Mechanical Installation (Assembly)
3 Mechanical Installation (Assembly)
3.
Prerequisites
The substructure must be:
• even,
• vibration-free, and
• torsionally stiff
NOTE
The connecting line is not trailing capable.
3.
Installation on substructure
NOTE
Use only the pre-established boreholes for the installation on the substructure. Additio-
nal boreholes at different positions are not allowed!
Fastening the device on the substructure requires three M4 screws (not supplied).
Boreholes for mounting screws
To install the unit on the substructure, proceed as follows:
1. Copy the borehole diagram (see the corresponding figure for the installation dimensions)
onto the substructure.
• The installation of the podis MOT on the substructure is carried out according to local
conditions in accordance with the borehole diagram.
2. Fasten the podis MOT on the substructure using at least two M4 screws.
• Observe the alignment according to the planned routing of the podis flat cable.
• The podis MOT is installed on the substructure.
• The mechanical installation is complete, the electrical installation may be started next.
Procedure
Procedure
Содержание podis MOT FP C
Страница 2: ......
Страница 22: ...Wieland Electric BA000349 05 2007 podis MOT FP C CM CP I IO RS485 SEW Device Description 2...
Страница 24: ...3 Wieland Electric BA000349 05 2007 Mechanical Installation Assembly 3...
Страница 44: ...5 Wieland Electric BA000349 05 2007 Commissioning 5...
Страница 46: ...6 Wieland Electric BA000349 05 2007 Operation 6...
Страница 62: ...9 6 Wieland Electric BA000349 05 2007 Appendix 9...
Страница 63: ......
Страница 64: ......