Starting
and
operating
Chapter 5
08.05.2019
Working Instructions WIDOS SPA 600
Page 16 of 42
5.4.
How to connect the SPA to the closed hydraulic aggregate,
from WIDOS 6100 steel version upwards
Put the SPA onto the hydraulic aggregate (arrow) and screw it (1).
Put the SPA onto the hydraulic aggregate (arrow) and fix it (1).
In case the T-piece (2) is not mounted to position, remove it from holder (7) and connect it to the
upper hydraulic connector of the aggregate.
Connect both hydraulic hoses (3) of the basic machine e.g. WIDOS 6100 steel version there.
Put the special plug of the heating element into the multipolar power socket at the SPA (5) and
secure by the bracket.
Connect the plug (4) of the SPA to the power socket (6) at the hydraulic aggregate.
Connect the mains plug of the hydraulic aggregate to the power supply, observe the correct voltage
(32 A (400 V) / 50 Hz).
5
2
3
4
6
1
7