INSTALLATION PROCEDURES –
Read before installation
WARNING: Maximum water pressure (including any potential pressure spikes) of the water
supply line to the system must not exceed 70 PSI (5.5 bar). Failure to comply will void the
warranty. The manufacturer accepts no liability for damage caused by excessive water
pressure.
1.
Always check local plumbing codes before tapping into water supply line and drain line. Tap into
the supply line with an approved connector.
2.
Once the unit and filtration system flushing procedures are complete, determine the best
installation location. Consider user convenience, electrical access and water access. The unit
performs optimally if within 20 feet of a cold-water supply line. Connect only to a cold water
supply.
Do not install Feed Water Assembly on the Hot Water Line
. Do not place unit where
it will be exposed to rain, freezing temperatures or direct sunlight.
3.
The rear of the unit should be installed at least 2” (5 cm) from any vertical surface to ensure
proper air circulation.
4.
Use only ¼” OD copper or plastic tubing to connect your water supply and drain to the cooler
water inlet and drain port. The inlet and drain ports are quick connect fittings. Units are shipped
with plugs in each fitting. Remove the plugs prior to inserting water supply and drain lines. A water
shut off valve is recommended between the inlet connection to the cooler and the water supply
connection.
5.
The W9CT RO system requires a waste or drain line for the RO membrane. The drain line should
include an Air Gap and back flow restrictor. See diagram.
6.
Check the available power supply to assure proper electrical service. In the U.S., the voltage
specification is 115 volt 60 hertz. Voltage outside of this specification will affect the system
performance
7.
Water filtration system will begin operating, verify proper water production.
8.
Turn the Heating System switch on the back of the unit to the “ON” position when hot tank is full.
9.
Perform final inspection of all installed water lines to ensure a leak free installation.
10.
Instruct user on proper system operation.
To Dispense Cold Water:
Allow at least 30 minutes for adequate cooling, then wave hand in front of the Cold
Water sensor
.
To Dispense Hot Water:
Allow at least 30 minutes for adequate heating, then wave hand over hot water select sensor, then the dispense sensor
NOTE: Check UPC and Local Plumbing Codes to confirm that all connections are in
compliance.
8
Содержание W9CT
Страница 22: ...22...
Страница 23: ...23...
Страница 24: ...24...
Страница 25: ...25...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28...
Страница 29: ...29...
Страница 30: ...30...
Страница 31: ...31...
Страница 32: ...32...
Страница 33: ...33...
Страница 34: ...34 34...
Страница 36: ...37 36...