Inspection
•
Turn the water to the system on, plug the system in and let the reservoir fill. RO
systems will fill in one to two hours. Filtration (M) system will fill in 5 to10 minutes.
•
Activate dispense sensors to verify flow from hot and cold tanks.
•
Drain cold water into container using the dispense nozzle. Activate touchless
dispense sensor until water flow ceases.
•
Located on the rear of the system is a hot tank drain. Holding a bucket under the
drain, remove drain cap and allow the system to drain until water flow stops.
Replace drain cap.
•
Repeat above steps.
•
Allow system to fill.
•
Turn hot switch located on back of unit to “ON” position.
•
Allow unit to sit for up to 2 hours to reach optimal operating temperature.
•
Verify the following:
•
There are no leaks or loose components.
•
The hot water is over 160°F.
•
The cold water is below 50°F.
•
Confirm acceptable product water flow
•
W9CT RO systems- Average tank fill for RO systems is 45 minutes.
•
W9CT UF systems- Average tank fill for filtration systems is 5 minutes.
•
The system exterior is clean, and all components are in place.
OTHER ITEMS
1.
Once a system has been flushed it should remain plugged in and water
dispensed occasionally.
2.
Always drain the system before moving it. It is not necessary to drain the Hot Tank
completely through the rear Hot Tank drain. Leaving water in the Hot Tank will allow
turning on the Hot Tank immediately after installation of the system.
3.
Be sure that if water is left in hot tank the system is installed the same day. Leaving
stagnant water in the tank may cause taste issues.
16
Содержание W9CT
Страница 22: ...22...
Страница 23: ...23...
Страница 24: ...24...
Страница 25: ...25...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28...
Страница 29: ...29...
Страница 30: ...30...
Страница 31: ...31...
Страница 32: ...32...
Страница 33: ...33...
Страница 34: ...34 34...
Страница 36: ...37 36...