The Weir Group PLC
Weir Industrial Gateway setup guide rev 0.5
Copyright © Weir Minerals Australia Ltd 2017. Commercial in Confidence. All rights reserved.
Page
10
of
46
Figure 6-2 MPM with connector shroud installed
Connector shroud must be installed at all times once connectors are in place to prevent
slurry/mud etc getting onto the connectors AND to meet hazardous location standards.
Figure 6-3 MPM connector view - protective caps installed
Connector caps shown are to be left installed for all connectors without a cable assembly
attached. This is required for hazardous location approvals.