Final checklist
Use the checklist following to ensure boiler is
operating correctly.
Have the following been completed?
Is proper orifice plate installed? Refer to
to check size
and fuel type.
Proper orifice plate must be used. Failure to do so
will cause severe personal injury, death or substan-
tial property damage.
Thermostat heat anticipator (if available) set properly? Refer
to Field wiring,
.
Read and followed all procedures and checks specified in the
Start-up section, beginning with
.
Perform the following
Inspect vent system for leaks. Verify vent (and air) piping are
functional and unobstructed.
Measure natural gas input:
a. Operate boiler 10 minutes.
b. Turn off other appliances.
c. At natural gas meter, measure time (in seconds) required
to use one cubic foot of gas.
d. Calculate gas input:
3600 x 1000
number of seconds from step
c
= Btuh
e. Btuh calculated should approximate input rating on boiler
rating label.
Test temperature limit — While burners are operating, turn
Boiler Temp adjustment knob counterclockwise until display
reading is below actual boiler water temperature. Burners
should go off while circulator continues to operate. Turn
Boiler Temp adjustment knob clockwise until display read-
ing is above boiler water temperature and ignition sequence
should resume.
Test additional field-installed controls — If boiler has an
additional low water cutoff, additional high limit or other
controls, test for operation as outlined by manufacturer.
Burner should be operating and should go off when controls
are tested. When controls are restored, boiler should restart.
Test low water cut off – While burner are operating, press
and hold “LWCO TEST” button on control. Burners should
go off while circulator continues to operate and LWCO light
should turn ON. Release “LWCO TEST” button and ignition
sequence should resume.
The ignition system (integrated boiler control (IBC)) safety
shutoff device must be tested.
a. Connect voltmeter to gas valve terminals.
b. Turn off manual gas valve.
c. Set thermostat to call for heat.
Legend for Figure 74
1 Gas control outlet pressure tap — located on back side of gas control. Use
tap closest to gas control gas outlet —Remove screw from gas control outlet
pressure tap and slide hose over tap.
2 Add tee hose fitting as shown.
3 Existing hose to gas control vent tap hose barb — Remove from gas control
vent tap and connect to end of tee as shown.
4 Gas control pressure regulator cap.
5 Honeywell Type VK8115V gas valve.
6 Gas outlet vent tap.
7 Gas outlet piping.
8 Add hose from gas control vent tap to tee hose fitting.
Figure 74
Carefully connect manometer to gas valve as
shown, following instructions on
,
(see legend above).
Start-up
(continued)