INSTALLATION SEQUENCE
— Concentric horizontal
Step 1
Read and follow all instructions in this manual.
DO NOT
proceed with vent/air installation until you have read
Step 2
Install the boiler in a location that allows proper routing of
all vent and air piping to the selected sidewall location.
Step 3
Make sure the selected sidewall termination location com-
plies with
. (Multiple boiler concentric
terminations must also comply with
.)
Step 4
Use only the vent materials listed in
Provide pipe adapters where required.
Step 5
Vent piping and air piping lengths must not exceed the
values shown in
.
Step 6
The concentric termination must be assembled and installed
before piping from the boiler to the termination.
Step 7
Prepare the sidewall penetration — assemble the concentric
termination kit and secure the cover plates as instructed in
this section. Provide the supports indicated and mount the
termination assembly. See
“Install termination — concentric
.
Step 8
Install vent and air piping between the boiler and the
concentric vent/air termination. Slope horizontal piping
downward toward the boiler at least 1/4 inch per foot. See
for general guidelines.
Step 9
Install pipe supports every 5 feet on both the horizontal and
vertical runs.
Step 10
Install a hanger support within 6 inches of any upturn in the
piping.
DIRECT VENT —
Sidewall with 3” concentric
Allowable vent/air pipe materials &
lengths
1. The 3” concentric termination kit must be pur-
chased separately.
Use only the vent materials and kits listed
. Provide pipe adapt-
ers if specified.
2. Locate the termination such that the total air piping
and vent piping from the boiler to the termination
will not exceed the maximum length given in
.
3. This termination requires a 45-degree elbow that
is not supplied with the termination kit. The maxi-
mum vent/air pipe lengths include allowance for
this elbow.
Determine termination location
1. The concentric termination kit must be installed as
shown in
2. The termination must comply with clearances and
limitations shown in
3. Locate the termination so it is not likely to be dam-
aged by foreign objects, such as stones or balls, or
subject to buildup of leaves or sediment.
Multiple vent/air terminations
1. When terminating multiple GV90+ boilers, install
each concentric termination as described in this
manual.
All vent pipes and air inlets must ter-
minate at the same height to avoid pos-
sibility of severe personal injury, death or
substantial property damage.
2. Place wall penetrations to obtain minimum clear-
ance as shown in
for U. S.
installations. For Canadian installations, provide
clearances required by CSA B149.1 Natural Gas
and Propane Installation Code or B149.2 Instal-
lation Code.
3. The air inlet of a GV90+ boiler is part of a direct
vent connection. It is not classified as a forced air
intake with regard to spacing from adjacent boiler
vents.