WECO 5K3 LV/HV
24
1.5
Out of the Box Pre-Operational Check
Attention:
Do not make any connection to the Battery Module until you have thoroughly read and
understood this entire manual.
Turn On the BMS Switch button The Power Button is located on the right side of the Battery Module as shown
above. The Power Button is a multi-colored button. Pressing the Power Button for 2 seconds will initiate the
startup process of the battery.
The Power Button will settle as a steady green color if the battery is operating correctly. If the battery is low
on charge, the Power Button will blink.
If the Power Button displays a flashing red color, there is a fault, and you should not attempt any further
operation of the battery but contact WeCo Module support at
There is also an RS232 monitoring port which will allow you to check all parameters of the Battery Module. Full
instructions on how to interface to the RS232 port can be found in this manual.
Attention:
At this stage, after you have determined that the battery is functioning correctly, it is
mandatory to switch the battery off and follow the instructions and guidance in this manual very carefully before
attempting any configuration or connection to the Battery Module.
To switch the battery off (shutdown the battery), simply press Start/Stop button for 5-seconds and the green LED light will
go off, confirming that the battery has shutdown correctly.
Attention:
Read this manual thoroughly, and always follow the guidance herein before and while
performing any installation procedure.
ATTENTION:
Before Operating make sure that the voltage is
equal to
0 Vdc
Battery must be turned off before starting any
activity
STEP 1
Turn On the BMS Switch
STEP 2
Press 2 sec. the Run Button
Suggested Action
Connect the PC and Check the
FW
Содержание UNIVERSAL 5K3HV
Страница 70: ...WECO 5K3 LV HV 70 3 6 HV Box ADDRESS...
Страница 75: ...WECO 5K3 LV HV 75...