![Weco UNIVERSAL 5K3HV Скачать руководство пользователя страница 63](http://html1.mh-extra.com/html/weco/universal-5k3hv/universal-5k3hv_installation-and-user-manual_949486063.webp)
WECO 5K3 LV/HV
63
3.5
Serial Battery Wiring Connections
ATTENTION:
POWER CABLE CONNECTIONS MUST BE MADE IN STRICT ACCORDANCE WITH THE
INSTRUCTIONS IN THIS MANUAL. INCORRECT POWER CONNECTIONS CAN DAMAGE THE
BATTERY AND CAUSE INJURIES OR SERIOUS DANGER AND DAMAGES.
Attention
:
Screws, Cables and Bus Bar POWER CONNECTIONS must be installed with due diligence, and the
tightening of the connection terminal must be to 15Nm (11.06 ft lb). Each terminal should be inspected, and its torque
checked every three months.
Attention:
All drawings are for reference only, always refer to the physical product as the standard. If the manual
does not match the physical product, stop all actions, remove any connections, store the batteries in a safe place and
call your WeCo Module technical representative for assistance.
Attention:
For power cable connection for high current connection diagram, please refer to the specific section.
Charging current limitation is mandatory as per this instruction manual.
Attention:
Do not use anything other than WeCo Module supplied power and data cables.
Caution
:
PRE-CHARGE
The inverter must be connected to the battery and any breaker/fuse installed
between the battery and Inverter must be closed
before turning on the battery
or the pre-charge
function will not have effect
Содержание UNIVERSAL 5K3HV
Страница 70: ...WECO 5K3 LV HV 70 3 6 HV Box ADDRESS...
Страница 75: ...WECO 5K3 LV HV 75...