WECO 5K3 LV/HV
47
2.8.2
Multi Cluster Configurations
1.
Before using the MASTER HUB device, make sure to update the WeCo BMS Battery Module Firmware with
the specific version for CLUSTER APPLICATION at
www.wecobatteries.com
2.
To use and set up the MASTER HUB, the installer must read the MASTER HUB MANUAL available in the
RESOURCES section of the www,wecobatteries.com website, under Energy Storage.
3.
Make sure to install the Specific Cluster Connection Firmware on each battery. The Cluster Connection Firmware
has a nomenclature starting with 4.xx. Please refer to the specific WeCo BMS Cluster Connection Firmware
version at
www.wecobatteries.com
4.
Set the Cluster ID using the Monitor Cluster Software.
5.
Connect the HUB (pre-configured with default setting). If the installers need to change the number of modules
per cluster or change the MASTER HUB communication protocol, it will be necessary to use the CAN ANALYST II to
set up the new configuration.
6.
Any breaker between battery and inverter must be closed before turning on the batteries to avoid Inrush current
Master Inverter
CAN LINE from each tower
CAN BMS to Inverter
NEGATIVE POWER
CABLES
2X50/75mm²
POSITIVE POWER
CABLES
2X50/75mm²
GROUND CABLES
10mm²
RS485 PARALLEL
RJ45 Cable
DATA COMM
GROUND CABLES
10mm²
TWO POLES
BREAKER
TWO POLES
BREAKER (UL)
PARALLEL BUS BAR
Содержание UNIVERSAL 5K3HV
Страница 70: ...WECO 5K3 LV HV 70 3 6 HV Box ADDRESS...
Страница 75: ...WECO 5K3 LV HV 75...