WECO 5K3 LV/HV
32
2.4
Parallel Battery Wiring Connections
ATTENTION:
POWER CABLE CONNECTIONS MUST BE MADE IN STRICT ACCORDANCE WITH THE INSTRUCTIONS
IN THIS MANUAL. INCORRECT POWER CONNECTIONS CAN DAMAGE THE BATTERY MODULE AND
CAUSE INJURIES.
14 Nm (10.33 ft lb)
Battery Terminal Block Power Cable Tighten
CHECK TORQUE EVERY THREE MONTHS
Attention
:
Screws, Cables and Bus Bar POWER CONNECTIONS on the battery terminal block must be installed
with due diligence, and the tightening of the connection terminal must be to 14 Nm (11.06 ft lb). Each terminal
should be inspected, and its torque checked every three months.
Attention:
All drawings are for reference only. Always refer to the physical product as the standard. If the
manual does not match the physical product, stop all actions, remove any connections, store the batteries in a
safe place and call your WeCo Module technical representative for assistance.
Attention:
For power cable connection for high current connection diagram, please refer to the specific
section. Charging current limitation is mandatory as per this instruction manual.
Содержание UNIVERSAL 5K3HV
Страница 70: ...WECO 5K3 LV HV 70 3 6 HV Box ADDRESS...
Страница 75: ...WECO 5K3 LV HV 75...