WCSEE- T300 INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Page 20 of 21
Start Up
It is very important that the air blowers are switched on BEFORE any sewage is
allowed to flow into the Aerated filter section.
As soon as sewage is introduced into the tank to provide flow, the bacterial
action will commence. The carbonaceous break down will start almost
immediately which will produce large quantities of foam. Although the
process will have started the initial quality of the effluent will initially be poor
with little treatment.
In order to reduce the time to full treatment the plant can be seeded with
activated sludge and / or proprietary bacteria, BUT a quantity of normal
sewage will also be required.
Procedure
1.
Switch on Blower(s) and check that air distribution is correct are working.
IMPORTANT:- on blowers with 3 phase motors check for correct rotation
BEFORE CONNECTING THE HOSES TO THE BLOWER(S)
2.
Introduce sewage into the tank at the design rate.
3.
Check after 12 to 24 hours that:-
I.
Blower(s) are running correctly and not overheating
II.
Air distribution in the Filter section is correct and that foam is being
produced
There is no further intervention required once the plant is in operation.