Smell 

 

Symptoms 

Corrections 

Smell escaping from 

the covers on the 

plant 

If venting is via the inlet pipework, ensure that the outlet T-

vent is closed and the inlet T-vent is open. If venting is via 
the outlet pipework, ensure that the inlet T-vent is closed 

and the outlet T-vent is open. Also check the seals around 

the covers and reposition as necessary. 
 

Smell escaping from 

the kiosk 

Check that any ducts to the plant (holding tank or pump 
chamber if installed) are sealed with expanding foam. 

Plant smells 

Check that grease has not entered the treatment plant. Do 
all the 'Annual Checks'. 

 

 
 

 

POOR AIR DISTRIBUTION OVER THE FILTER SECTION 

 

Cause 

Correction 

Blocked air Diffusers 

(NOT relevant to 

the T3HP Hire 
Unit) 

 

 

 

VALVE

 

TOP

 

UNION

 

TO 

DIFFUSER 

LEG

 

 

 

 

Turn off all but one of the air diffusers at the valves.  Then 

proceed to check the one that is on for the position of bubbles. 

The increased pressure should clear any blockage in the 

diffuser.  If not the diffuser can be removed by switching the air 

supply (blower) off and disconnecting the diffuser tube at the 
top of valve, turning through 90o and lifting up through the 

diffuser access slot. On early units the diffuser is screwed into 

the fitting on the end of the tube and can be removed for 
cleaning or replacement. Later units have a cap with a 5mm 

hole in the end. In addition there are also some cross holes on 

some of the horizontal pipe. Clear all holes. 

UNSCREW

DIFFUSER LEG

 

Repeat as required for any other suspect blocked diffusers, and 
then move the air diffusers by angling the tube as required to 

improve air distribution. 

 

Filter media partially 

blocked by excessive 

biomass 

This indicates that the plant is overloaded, check design 

loading and contact WCSEE for advice. 

Filter media partially 

blocked with sludge 

This indicates carry over from primary tank, check sludge 

levels and de-sludge if required.  Also check for excessive flow 

possibly due to ground water ingress into foul sewer. 

 

 

Содержание WCSEE T300

Страница 1: ...WCSEE T300 T3HP FOR HIRE INSTALLATION OPERATION MAINTENANCE MANUAL...

Страница 2: ...M E installation 6 Warranty limitations and exemptions 6 Chargeable non warranty work 6 3 Risk assessment 7 Introduction 7 3 1 1 Installation Design Considerations 7 3 1 2 Installation and positioning...

Страница 3: ...AIR DISTRIBUTION OVER THE FILTER SECTION 18 Blocked air Diffusers 18 Filter media partially blocked by excessive biomass 18 Filter media partially blocked with sludge 18 8 PLANT START UP 19 Introducti...

Страница 4: ...D T300 tanks have been laid out to ensure that health and safety on site is optimised in line with designer duties specified by the CDM regulations 2015 It will be safe manner and agrees with comments...

Страница 5: ...contact with sewage report to your doctor immediately advising them of the circumstances Vaccinations To avoid the possibility of illness it is recommended that all site personnel have the following v...

Страница 6: ...ranty are limited life of consumable components subject to normal wear and tear Chargeable non warranty work Service charges will be incurred including parts and labour due to the following Unauthoriz...

Страница 7: ...will be using it e g domestic light industrial etc Costs legal implications and siting in consideration to shared systems The whereabouts of wells boreholes and springs used as sources of potable wate...

Страница 8: ...until the system is complete commissioned and is operating in a stable manner 3 1 3 Maintenance The legal responsibility for the plant as far as operation and maintenance and on going discharge is co...

Страница 9: ...e tank and kiosk are manufactured in GRP for corrosion resistance and long life As these units are above ground and generally receiving pumped flows it is therefore necessary to provide suitable flow...

Страница 10: ...evel access 10m of 2 High temperature air hose is provided to connect the blower process air to the tank Connecting the air hose to the Kiosk 2 hosetail connection mounted on the manifold within the K...

Страница 11: ...rrangement and the unit comes equipped with a lid for access by WCSEE only 10m of 2 High air temperature hose is provided to connect the blower process air to the tank Connecting the air hose to the K...

Страница 12: ...on the water temperature and site conditions It is important that the sewage input conditions are kept within the plant design criteria Refer to section 8 Start Up Procedure Both the T300 Tank and the...

Страница 13: ...n the Auto position As indicated in Picture 1 below This set up will allow the timer to be in operation When the main switch located on the front of the control panel is in the Auto position the low a...

Страница 14: ...de will run the blower in manual setting as indicated in Picture 3 below It is advisable that once a week to run the blower s in manual mode for 4 hours to scour the media Picture 3 On the Timer selec...

Страница 15: ...st be installed by WCS EE or the process of the sewerage treatment plant will not be guaranteed by WCS EE On factory fitted timers a visit is required after 2 months in operation to check the D O Diss...

Страница 16: ...ower air filters are clear and knock off any collected dust or replace if necessary On the T3HP Hire Unit the air diffusers for the biozone are split into two zones In normal operation the air feeds b...

Страница 17: ...ot switch off and call an electrician Blower runs intermittently Check that the cooling fan is running and the air ducts are clear as overheating in the cabinet will cause the high temperature trip to...

Страница 18: ...on for the position of bubbles The increased pressure should clear any blockage in the diffuser If not the diffuser can be removed by switching the air supply blower off and disconnecting the diffuse...

Страница 19: ...en and this will be partially converted to nitrogen gas before being discharged The carbonaceous bacteria are more prolific and also less prone to damage by chemicals cleaning agents than the nitrifyi...

Страница 20: ...e poor with little treatment In order to reduce the time to full treatment the plant can be seeded with activated sludge and or proprietary bacteria BUT a quantity of normal sewage will also be requir...

Страница 21: ...inue running the blowers 4 During this time the biomass will gradually die off with the fresh water passing through the unit 5 Continue this operation for a minimum period of one 1 week to ensure all...

Страница 22: ......

Отзывы: