background image

WCSEE- T300 INSTALLATION, OPERATION AND MAINTENANCE MANUAL  

 

Page 8 of 21                 

 

3.1.2

 

Installation and positioning 

 

Siting

  -  The  plant  must  be  sited  within  30m  of  heavy  vehicle  access  for 

draining.  The plant should, where possible, be sited above the high-water 

table  mark  and  above  or  beyond  the  flood  plain.    See  items  above  and 

accompanying  note.   The  plant  should be  sited as  far  from  the  habitable 
parts of the dwelling as possible.  Many local authorities recommend 10m 

as a minimum, but easements are possible for smaller sites. 

 

Electrical  supply

 

  If  the  plant  has  been  equipped  with  a  pumped  de-

sludge  option,  a  qualified  electrician  should  only  undertake  electrical 
installation.  A safe and reliable power supply is required at all times, as the 

pumps  are  required  to  de-sludge  at  intervals  24/7.  Adequate  means  of 
power  failure  indication  should  be  provided.    This  can  be  an  audible  or 

visual alarm or by regular manual checks. 

Note: 

Due to the health risks associated with raw sewage, WCSEE recommend 

that  the  SAF  treatment  plant  is  not  used  until  the  system  is  complete, 

commissioned and is operating in a stable manner. 
 

 

3.1.3

 

Maintenance 

 

The legal responsibility for the plant as far as operation and maintenance 

and on-going discharge is concerned.

 

 

Electrical  supply:  a  qualified  electrician  should  undertake  the  electrical 
installation.  
A  reliable  power  supply  will  be  required  at  all  times,  so  an  indication  of 
power failure will be required, which can be audible or visual. 

 

Any  visiting  personnel  should  report  to  the  site  office  and  acquaint 
themselves with the specific site health and safety protocol. 

 

Before  carrying  out  any  maintenance  or  installation  on  the  equipment  it 
should  be  electrically  isolated,  unless  a  trained  electrician  is  carrying  out 
specific  checks  under  controlled  conditions.  When  performing  works  of 
this nature, warning signs should be erected to alert others of the works in 
progress. 

 

For all works, risk assessments and method statements will be required to 
carry out work on site. These should identify the method of work and the 
risks associated. 

 

Temporary barriers and warning signs should be erected around any open 

covers or manholes as appropriate, in particular warning of deep water in 

the tanks.  

 

See section 7 for routine maintenance. 

 
 

 
 

 

 

Содержание WCSEE T300

Страница 1: ...WCSEE T300 T3HP FOR HIRE INSTALLATION OPERATION MAINTENANCE MANUAL...

Страница 2: ...M E installation 6 Warranty limitations and exemptions 6 Chargeable non warranty work 6 3 Risk assessment 7 Introduction 7 3 1 1 Installation Design Considerations 7 3 1 2 Installation and positioning...

Страница 3: ...AIR DISTRIBUTION OVER THE FILTER SECTION 18 Blocked air Diffusers 18 Filter media partially blocked by excessive biomass 18 Filter media partially blocked with sludge 18 8 PLANT START UP 19 Introducti...

Страница 4: ...D T300 tanks have been laid out to ensure that health and safety on site is optimised in line with designer duties specified by the CDM regulations 2015 It will be safe manner and agrees with comments...

Страница 5: ...contact with sewage report to your doctor immediately advising them of the circumstances Vaccinations To avoid the possibility of illness it is recommended that all site personnel have the following v...

Страница 6: ...ranty are limited life of consumable components subject to normal wear and tear Chargeable non warranty work Service charges will be incurred including parts and labour due to the following Unauthoriz...

Страница 7: ...will be using it e g domestic light industrial etc Costs legal implications and siting in consideration to shared systems The whereabouts of wells boreholes and springs used as sources of potable wate...

Страница 8: ...until the system is complete commissioned and is operating in a stable manner 3 1 3 Maintenance The legal responsibility for the plant as far as operation and maintenance and on going discharge is co...

Страница 9: ...e tank and kiosk are manufactured in GRP for corrosion resistance and long life As these units are above ground and generally receiving pumped flows it is therefore necessary to provide suitable flow...

Страница 10: ...evel access 10m of 2 High temperature air hose is provided to connect the blower process air to the tank Connecting the air hose to the Kiosk 2 hosetail connection mounted on the manifold within the K...

Страница 11: ...rrangement and the unit comes equipped with a lid for access by WCSEE only 10m of 2 High air temperature hose is provided to connect the blower process air to the tank Connecting the air hose to the K...

Страница 12: ...on the water temperature and site conditions It is important that the sewage input conditions are kept within the plant design criteria Refer to section 8 Start Up Procedure Both the T300 Tank and the...

Страница 13: ...n the Auto position As indicated in Picture 1 below This set up will allow the timer to be in operation When the main switch located on the front of the control panel is in the Auto position the low a...

Страница 14: ...de will run the blower in manual setting as indicated in Picture 3 below It is advisable that once a week to run the blower s in manual mode for 4 hours to scour the media Picture 3 On the Timer selec...

Страница 15: ...st be installed by WCS EE or the process of the sewerage treatment plant will not be guaranteed by WCS EE On factory fitted timers a visit is required after 2 months in operation to check the D O Diss...

Страница 16: ...ower air filters are clear and knock off any collected dust or replace if necessary On the T3HP Hire Unit the air diffusers for the biozone are split into two zones In normal operation the air feeds b...

Страница 17: ...ot switch off and call an electrician Blower runs intermittently Check that the cooling fan is running and the air ducts are clear as overheating in the cabinet will cause the high temperature trip to...

Страница 18: ...on for the position of bubbles The increased pressure should clear any blockage in the diffuser If not the diffuser can be removed by switching the air supply blower off and disconnecting the diffuse...

Страница 19: ...en and this will be partially converted to nitrogen gas before being discharged The carbonaceous bacteria are more prolific and also less prone to damage by chemicals cleaning agents than the nitrifyi...

Страница 20: ...e poor with little treatment In order to reduce the time to full treatment the plant can be seeded with activated sludge and or proprietary bacteria BUT a quantity of normal sewage will also be requir...

Страница 21: ...inue running the blowers 4 During this time the biomass will gradually die off with the fresh water passing through the unit 5 Continue this operation for a minimum period of one 1 week to ensure all...

Страница 22: ......

Отзывы: