WCSEE- T300 INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Page 12 of 21
5.
PLANT OPERATION
The plant is designed to operate continuously with the minimum of maintenance
after it has been commissioned. The plant will provide effluent within the
designed discharge consent standard after an initial start-up period, of 4 to 10
weeks depending on the water temperature and site conditions.
*It is important that the sewage-input conditions are kept within the plant
design criteria. Refer to section 8. Start Up Procedure.
Both the T300 Tank and the Hire T3HP come with duty/standby blowers (Elmo
Rietschle 3.45Kw, 3 phase 2BH1510). The blower operates continuously to provide
air for the biological process in the filter section.
Note:- The T3HP Hire Kiosk comes equipped with an external 3ph, 32A 5-pin
socket, mounted to the outside of the Kiosk. This allows for an easy and fast
installation.