WCSEE- T300 INSTALLATION, OPERATION AND MAINTENANCE MANUAL  

 

Page 6 of 21                 

 

 

M&E installation 

WCSEE  LTD  takes  no  responsibility  for  improper  storage,  or  bad 

installation/maintenance  performed  by  unqualified  personnel.  This  also  covers 

the  overloading  of  the  plates,  above  that  of  normal  conditions,  and  any  other 
accidental cause, or disregard for the information in this document. 

 

 

Warranty limitations and exemptions 

WCSEE  Ltd  shall  not  be  liable  for  any  labor  involved  for  the  removal  or 
replacement  of  its  equipment  or  the  subsequent  transportation,  handling  or 

packaging  of any  part  or  parts thereof.  In no  case  will  WCSEE Ltd  be  liable  for 

loss  incurred  because  of  interruption  of  service  or  for  consequential  damages, 
labor  or  expense  required  to  repair  defective  units,  nor  shall  this  constitute  a 

cause  for  the  cancellation  of  the  contract  of  purchase  and  sale.  Specifically 
exempt from this warranty are limited life of consumable components subject to 

normal wear and tear. 

 

 

Chargeable non warranty work 

Service charges will be incurred (including parts and labour), due to the 
following: 

 

 

Unauthorized alteration. 

 

Accidental  damage,  caused  by  plant  or  movement  on  site  outside  of 

WCSEE

’s control.

 

 

Improper use. 

 

Abuse. 

 

Tampering. 

 

Failure to follow installation instructions or failure to follow operating and 

maintenance procedures. 

 

The above will not be covered by this warranty. All service visits for non-warranty 

work  are  chargeable  at  the  standard  engineer  day  rate  plus  mobilization.  This 

warranty gives specific additional benefits. Statutory rights are unaffected. 
 

Note:

 WCSEE LTD will not uphold the guarantee on the purchased equipment if 

the routine maintenance has not been performed and documented. 

 

WCSEE LTD strongly recommends that the installation of the purchased product 
is  carried  out  by  a  qualified  and  experienced  installer.  Dependent  on  the  site  a 

suitably qualified civil engineer may need to be consulted for the construction of 
suitable base slab to support the imposed load. 

 

 
 

 
 

 

 
 

Содержание WCSEE T300

Страница 1: ...WCSEE T300 T3HP FOR HIRE INSTALLATION OPERATION MAINTENANCE MANUAL...

Страница 2: ...M E installation 6 Warranty limitations and exemptions 6 Chargeable non warranty work 6 3 Risk assessment 7 Introduction 7 3 1 1 Installation Design Considerations 7 3 1 2 Installation and positioning...

Страница 3: ...AIR DISTRIBUTION OVER THE FILTER SECTION 18 Blocked air Diffusers 18 Filter media partially blocked by excessive biomass 18 Filter media partially blocked with sludge 18 8 PLANT START UP 19 Introducti...

Страница 4: ...D T300 tanks have been laid out to ensure that health and safety on site is optimised in line with designer duties specified by the CDM regulations 2015 It will be safe manner and agrees with comments...

Страница 5: ...contact with sewage report to your doctor immediately advising them of the circumstances Vaccinations To avoid the possibility of illness it is recommended that all site personnel have the following v...

Страница 6: ...ranty are limited life of consumable components subject to normal wear and tear Chargeable non warranty work Service charges will be incurred including parts and labour due to the following Unauthoriz...

Страница 7: ...will be using it e g domestic light industrial etc Costs legal implications and siting in consideration to shared systems The whereabouts of wells boreholes and springs used as sources of potable wate...

Страница 8: ...until the system is complete commissioned and is operating in a stable manner 3 1 3 Maintenance The legal responsibility for the plant as far as operation and maintenance and on going discharge is co...

Страница 9: ...e tank and kiosk are manufactured in GRP for corrosion resistance and long life As these units are above ground and generally receiving pumped flows it is therefore necessary to provide suitable flow...

Страница 10: ...evel access 10m of 2 High temperature air hose is provided to connect the blower process air to the tank Connecting the air hose to the Kiosk 2 hosetail connection mounted on the manifold within the K...

Страница 11: ...rrangement and the unit comes equipped with a lid for access by WCSEE only 10m of 2 High air temperature hose is provided to connect the blower process air to the tank Connecting the air hose to the K...

Страница 12: ...on the water temperature and site conditions It is important that the sewage input conditions are kept within the plant design criteria Refer to section 8 Start Up Procedure Both the T300 Tank and the...

Страница 13: ...n the Auto position As indicated in Picture 1 below This set up will allow the timer to be in operation When the main switch located on the front of the control panel is in the Auto position the low a...

Страница 14: ...de will run the blower in manual setting as indicated in Picture 3 below It is advisable that once a week to run the blower s in manual mode for 4 hours to scour the media Picture 3 On the Timer selec...

Страница 15: ...st be installed by WCS EE or the process of the sewerage treatment plant will not be guaranteed by WCS EE On factory fitted timers a visit is required after 2 months in operation to check the D O Diss...

Страница 16: ...ower air filters are clear and knock off any collected dust or replace if necessary On the T3HP Hire Unit the air diffusers for the biozone are split into two zones In normal operation the air feeds b...

Страница 17: ...ot switch off and call an electrician Blower runs intermittently Check that the cooling fan is running and the air ducts are clear as overheating in the cabinet will cause the high temperature trip to...

Страница 18: ...on for the position of bubbles The increased pressure should clear any blockage in the diffuser If not the diffuser can be removed by switching the air supply blower off and disconnecting the diffuse...

Страница 19: ...en and this will be partially converted to nitrogen gas before being discharged The carbonaceous bacteria are more prolific and also less prone to damage by chemicals cleaning agents than the nitrifyi...

Страница 20: ...e poor with little treatment In order to reduce the time to full treatment the plant can be seeded with activated sludge and or proprietary bacteria BUT a quantity of normal sewage will also be requir...

Страница 21: ...inue running the blowers 4 During this time the biomass will gradually die off with the fresh water passing through the unit 5 Continue this operation for a minimum period of one 1 week to ensure all...

Страница 22: ......

Отзывы: