Lync WQ-RS
SECTION 3: OPERATION
L- OMM-005_A
•
2/23/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
12
of
34
NOTES:
See the controller section of this manual for more installation and operation information.
It is very important to vent the mechanical seal during startup. Failure to vent the seal may
result in premature seal failure.
Figure 3-1 Needle Valve Location
Drain Plug
Vented Priming Plug
Back off needle valve to vent air.
Retighten to 25 in.-lbs. when vent port
runs a steady stream of water.