Lync WQ-RS
SECTION 3: OPERATION
L- OMM-005_A
•
2/23/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
27
of
34
Increased
Increased Decreased Most severe in
the first stage
Abrasion of
membrane by
crystalline
material
Microscopic solids
analysis of feed.
Destructive
element test.
Improved pretreatment.
Check all filters for media
leakage.
Increased
Normal to
increased
Decreased At random
O-ring leaks,
End or side seal
glue leaks.
Probe test.
Vacuum test.
Colloidal material
passage.
Replace O-rings. Repair or
replace elements.
Increased
Normal to
low
Decreased All stages
Conversion too
high.
Check flows and
pressures against
design guidelines
Reduce conversion rate.
Calibrate sensors.
Increase analysis and data
collection.