Lync WQ-RS
SECTION 3: OPERATION
L- OMM-005_A
•
2/23/2022
Technical Support • (800) 433-5654 • Mon-Fri, 8 am - 5 pm EST
19
of
34
Install the Conductivity Probe in the
“Run” of a Tee or equivalent location. Orient the probe so
that air cannot become trapped in the area near the probe.
Figure 3-7
Conductivity Probe Installation
Figure 3-8
Input Wiring
Conductivity Probe
Line 2 input for 460 volts
Line 2 input for 230 volts
Line 2 input for 208 volts
Line 1 input for all voltages
Flow
Flow