Figure 2–9: Location of solvent vent tubing
Solvent vent tubing
3.
In the console, select the solvent manager, and then click
Control
>
Prime solvents
.
4.
In the Prime Solvents dialog box, select solvent
A
,
B
,
C
,
D
, or (instead of
D
)
D
1
through
D
6
.
5.
In the Time box, specify the number of minutes, from 0.1 through 60.0.
Default:
2.0 minutes
Recommendation:
Prime the solvent manager until a steady flow exits the vent tubing
(typically four to seven minutes per solvent).
6.
Click
Start
.
Tip:
When solvent flows from the vent tubing continuously, the path is primed.
Requirement:
Ensure that enough solvent remains in the solvent reservoirs to supply
subsequent methods.
2.7.2 Priming a dry solvent manager using a syringe
Warning:
Observe Good Laboratory Practice (GLP) at all times, particularly when
working with hazardous materials. Consult the Material Safety Data Sheets regarding
the solvents you use. Additionally, consult the safety representative for your
organization regarding its protocols for handling such materials.
Notice:
To avoid contaminating system components, wear clean, chemical-resistant,
powder-free gloves when performing this procedure.
Requirement:
Wear clean, chemical-resistant, powder-free gloves when performing
this procedure.
August 8, 2016, 715005050 Rev. C
Page 36