
Cleaning the sample cone and gas cone
December 6, 2012, 71500126802IVD Rev. C
83
1. Ensure that the source isolation valve is in the closed position (see
2. Hold the cone gas assembly so that the connection tube is horizontal and
at the top, then slide the cone gas assembly into the ion block assembly.
3. Grasp the cone gas assembly connection tube and use it as a handle to
rotate the cone gas assembly 90 degrees, moving the connection tube
from the horizontal to the vertical position.
4. Connect the PTFE tube to the cone gas assembly connection tube.
5. Open the source isolation valve.
6. Close the source enclosure door, and secure it with both spring-clips.
7. Close the instrument’s access door.
RP00009
Ion block
assembly
Cone gas
assembly
Содержание TQ
Страница 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Страница 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Страница 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Страница 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Страница 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...