
B External Connections
186
December 6, 2012, 71500126802IVD Rev. C
5. Insert the connector with the signal cable into the connection cover, and
position the clamp over the cable leads. Tighten the clamp into place
with the second self-tapping screw.
6. Place the second connection cover over the first cover, and snap it into
place.
Cable leads
Clamp
TP02588
Signal connector
Connection cover
Содержание TQ
Страница 34: ...1 Waters TQ Detector 34 December 6 2012 71500126802IVD Rev C...
Страница 144: ...4 Maintenance Procedures 144 December 6 2012 71500126802IVD Rev C...
Страница 156: ...A Safety Advisories 156 December 6 2012 71500126802IVD Rev C...
Страница 188: ...B External Connections 188 December 6 2012 71500126802IVD Rev C...
Страница 192: ...C Materials of Construction and Compliant Solvents 192 December 6 2012 71500126802IVD Rev C...