![background image](http://html1.mh-extra.com/html/warmflow/wah-100/wah-100_installation-and-servicing-manual_3405183024.webp)
6.1.3 G20S Burner
6.2
Oil Supply
The burner is supplied for use with a one pipe system. For use on a two pipe system,
it is necessary to remove the return port plug and fit a small by-pass plug as shown.
1.
Suction port
2.
To nozzle
3.
Pressure gauge port/air bleed
4.
Pump pressure adjustment
5.
Vacuum port
6.
To hydraulic ram
7.
Return port
8.
By-pass plug
1.
Return line
6.
Hydraulic jack with air-damper
2.
Suction line
7.
Combustion head adjustment screw
3.
Gauge connection
8.
Lock-out lamp and reset button
4.
Pump pressure regulator
9.
Flange with insulating shield
5.
Suction gauge connection
10. Start delaying device
Page 22
Содержание WAH 100
Страница 16: ...3 7 7 Wiring Diagram for Single Phase Control Panel Page 14...
Страница 17: ...3 7 8 Wiring Schematic for Single Phase Control Panel Page 15...
Страница 19: ...3 7 10 Wiring Schematic for Three Phase Control Panel Page 17...
Страница 30: ...Notes Page 28...