7.2.1 Fold Up the Lead-In and Log-Loader
Chutes
1.
Remove the linchpin from the tab that secures the latch bar
in position. Keep it accessible to secure the chutes.
2.
Use the handle to lift up the lead-in chute and rotate it until
it is resting on top of the log-loader chute.
3.
Open the two toggle-clamp latches to release the log-loader
chute. The latches are located below the log-loader chute
(one on each side):
-
Rotate the handle down to the open position.
-
Remove the latch bar from the catch plate.
-
Rotate the handle up to the closed position.
4.
Fold up the log-loader and lead-in chutes.
5.
Lift the latch bar and slide it over the tab on the LH side of
the log-loader chute.
6.
Install the linchpin (removed in Step 1) through the
log-loader tab to secure the chutes.
7.
Rotate each of the two bracing jacks to the vertical
position:
-
Remove the snap pin.
-
Rotate the bracing jack.
-
Insert the snap pin.
01225
Fig. 48 –
Lock arm and latch pin
7.2.2 Fold Up the Splitter Chute
1.
Remove the linchpin from the tab on the LH side of the
splitting wedge guard.
2.
Remove the hitch pin that secures the splitter chute to the
splitting cradle. Remove the linchpin, and then slide it out.
3.
Use the handle to carefully fold up the splitter chute.
4.
Insert the linchpin (removed in Step 1) through the tab you
removed it from to secure the splitter chute.
5.
Insert the hitch pin through the splitting-cradle bracket
(removed in Step 2) for safekeeping. Insert the linchpin
through the hitch pin.
01837
Fig. 49 –
Fold up the splitter chute
WP845 / WP875
Trailer Firewood Processor
Transport
51
Содержание WP845
Страница 44: ...01218 Fig 46 Position the log in the machine Operating Instructions WP845 WP875 Trailer Firewood Processor 44...
Страница 50: ...Fig 47 Transport position WP845 Transport WP845 WP875 Trailer Firewood Processor 50...
Страница 55: ...Fig 53 Storage WP875 01227 WP845 WP875 Trailer Firewood Processor Storage 55...
Страница 71: ......
Страница 72: ...WallensteinEquipment com...