![WAGNER TOPFINISH DD10 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/wagner/topfinish-dd10/topfinish-dd10_operating-manual_868276025.webp)
25
VERSION 12/2017
ORDER NUMBER DOC 2366672
TOPFINISCH DD10
7
OPERATION
7.1
TRAINING THE OPERATING STAFF
The operating staff must be qualified to operate the entire system.
The operating staff must be familiar with the potential risks associated with
improper behavior as well as the necessary protective devices and measures.
Before work commences, the operating staff must receive appropriate system
training.
7.2
EMERGENCY STOP
In the case of unforeseen occurrences:
– Close ball valve.
– The air supply should be interrupted.
B_06917
open
closed
7.3
WORK
Ensure that:
commissioning is carried out in accordance with Chapter
.
1. Visual check:
personal safety equipment, grounding and all devices ready to use.
2. Secure spray gun and insert valve into the spray gun.
3. Slowly open the ball valve.
4. Set the required working pressure on the pressure regulator.
5. Optimize the spray pattern as laid down in the spray gun instructions.
6. Start work process.
Содержание TOPFINISH DD10
Страница 1: ...TOPFINISH DD10 Pneumatic Double Diaphragm Pump Version 12 2017 B_05369 B_06420 ...
Страница 2: ......
Страница 47: ......