Project planning limits
The following limit values must be complied with at all times with the TITA-
NUS
®
per pipe system connected:
▪ Standard project planning
– The minimum pipe length between 2 aspiration apertures is 4 m.
– The maximum pipe length between 2 aspiration apertures is 12 m.
– The maximum overall pipe length is 200 m
(2 x 200 m with 2 pipe systems connected).
– A maximum of 24 aspiration apertures are possible per detector
module.
▪ Simplified pipe project planning
– The minimum pipe length between 2 aspiration apertures is 0.1 m.
– The maximum pipe length between 2 aspiration apertures is 4 m.
– The maximum overall pipe length is 100 m
(2 x 100 m with 2 pipe systems connected).
– A maximum of 20 aspiration apertures are possible per detector
module.
▪ Project planning with acceleration apertures
– The minimum pipe length between 2 aspiration apertures is 4 m.
– The maximum pipe length between 2 aspiration apertures is 12 m.
– The maximum overall pipe length is 300 m
(2 x 280 m with 2 pipe systems connected).
– A maximum of 100 aspiration apertures are possible per detector
module.
The maximum monitoring area per sampling aperture corresponds to the
monitoring area of point-shaped detectors in accordance with the applicable
project planning guideline.
The maximum overall monitoring area, the maximum overall pipe length and
the maximum number of aspiration apertures are independent of the project
planning selected, as are the restrictions from national regulations.
5.1.5
Содержание TITANIUS TOP-SENS
Страница 1: ...Air sampling smoke detection system Fire Detection TITANUS TOP SENS Rev a Technical Manual ...
Страница 2: ......
Страница 4: ......
Страница 12: ...TITANUS TOP SENS Rev a Rev a 12 06 13 ...
Страница 16: ......
Страница 56: ......
Страница 62: ...Design TITANUS TOP SENS Rev a 62 06 13 Figure 32 Pipe designs ...
Страница 72: ...Design TITANUS TOP SENS Rev a 72 06 13 ...
Страница 127: ...TITANUS TOP SENS Rev a Installation 06 13 127 Figure 69 Borehole spaces of the support type MT 1 ...
Страница 130: ...Installation TITANUS TOP SENS Rev a 130 06 13 Figure 71 General outlay of the terminal blocks of the circuit board ...
Страница 140: ...Installation TITANUS TOP SENS Rev a 140 06 13 Figure 77 Connecting the TITANUS ...
Страница 148: ......
Страница 156: ...Installation of the pipe system TITANUS TOP SENS Rev a 156 06 13 Figure 88 Attaching the aspiration reducing film sheet ...
Страница 204: ......
Страница 206: ......
Страница 210: ......
Страница 216: ......
Страница 226: ......
Страница 240: ......
Страница 246: ...TITANUS TOP SENS Rev a Glossary TS_A_Glossar en e DOC Data 04 09 ...
Страница 247: ......
Страница 248: ......
Страница 249: ...TITANUS TOP SENS Rev a 06 13 205 ...
Страница 250: ...TITANUS TOP SENS Rev a ...