
TITANUS
TOP·SENS
®
/Rev.a
Installation of the pipe system
06/13
159
cap of the air sampling pipe. If necessary, please heat the hose by hot
air gun.
NOTICE
The whole of aspiration reducing film sheet must be located over the open-
ing of pipe cap directly. The diameter of opening in the aspiration reducing
film sheet must not be changed.
To keep the glued surface of the film clean from dust and grease, please
avoid any contact.
WARNING
The air sampling hose cannot be monitored during the application of ceiling
ducts with up-streamed aspiration reduction within the T-pieces (pipe
caps).
Содержание TITANIUS TOP-SENS
Страница 1: ...Air sampling smoke detection system Fire Detection TITANUS TOP SENS Rev a Technical Manual ...
Страница 2: ......
Страница 4: ......
Страница 12: ...TITANUS TOP SENS Rev a Rev a 12 06 13 ...
Страница 16: ......
Страница 56: ......
Страница 62: ...Design TITANUS TOP SENS Rev a 62 06 13 Figure 32 Pipe designs ...
Страница 72: ...Design TITANUS TOP SENS Rev a 72 06 13 ...
Страница 127: ...TITANUS TOP SENS Rev a Installation 06 13 127 Figure 69 Borehole spaces of the support type MT 1 ...
Страница 130: ...Installation TITANUS TOP SENS Rev a 130 06 13 Figure 71 General outlay of the terminal blocks of the circuit board ...
Страница 140: ...Installation TITANUS TOP SENS Rev a 140 06 13 Figure 77 Connecting the TITANUS ...
Страница 148: ......
Страница 156: ...Installation of the pipe system TITANUS TOP SENS Rev a 156 06 13 Figure 88 Attaching the aspiration reducing film sheet ...
Страница 204: ......
Страница 206: ......
Страница 210: ......
Страница 216: ......
Страница 226: ......
Страница 240: ......
Страница 246: ...TITANUS TOP SENS Rev a Glossary TS_A_Glossar en e DOC Data 04 09 ...
Страница 247: ......
Страница 248: ......
Страница 249: ...TITANUS TOP SENS Rev a 06 13 205 ...
Страница 250: ...TITANUS TOP SENS Rev a ...