Installation
TITANUS
TOP·SENS
®
/Rev.a
120
06/13
The default setting for the fan voltage is 6.9 V. The fan voltage can be ad-
justed according to project planning by plugging or removing the BR 1 and/or
BR 2 bridges. The symbols used mean:
X = pin pair bridge
O = pin pair open
The standard settings have a grey background.
Setting of ventilator voltage
FC-2
Bridge Pin-No.
BR1, 1+2
Bridge Pin-No.
BR2, 1+2
6,5 V
O
X
6.9 V (standard)
X
O
9 V
O
O
Setting of ventilator voltage
FC-3
Bridge Pin-No.
BR1, 1+2
Bridge Pin-No.
BR2, 1+2
10 V
O
X
11 V (standard)
X
O
12 V
O
O
WARNING
The BR 3 bridge on the base board must always be removed.
WARNING
Conduct the air flow initialisation again if you change the fan voltage. Only
close or open the BR 1 and BR 2 bridges when the device is turned off.
Connecting the fan TITANUS
®
-SL
The electrical connection of the fan control circuit board is made via terminal
block X7 (FAN) on the main board (see fig. main board) of TITANUS
TOP·SENS
®
.
▪ Connect terminal 1 of terminal board X7 on the base board to terminal 2
(+) of terminal board X2 on the fan control circuit board
▪ Connect terminal 2 of terminal board X7 on the main board to terminal 1
(-) of terminal board X2 on the fan control circuit board
▪ Connect the fan’s brown connection line to terminal board X1 / terminal 1
of the fan control circuit board
6.3.1.10
Содержание TITANIUS TOP-SENS
Страница 1: ...Air sampling smoke detection system Fire Detection TITANUS TOP SENS Rev a Technical Manual ...
Страница 2: ......
Страница 4: ......
Страница 12: ...TITANUS TOP SENS Rev a Rev a 12 06 13 ...
Страница 16: ......
Страница 56: ......
Страница 62: ...Design TITANUS TOP SENS Rev a 62 06 13 Figure 32 Pipe designs ...
Страница 72: ...Design TITANUS TOP SENS Rev a 72 06 13 ...
Страница 127: ...TITANUS TOP SENS Rev a Installation 06 13 127 Figure 69 Borehole spaces of the support type MT 1 ...
Страница 130: ...Installation TITANUS TOP SENS Rev a 130 06 13 Figure 71 General outlay of the terminal blocks of the circuit board ...
Страница 140: ...Installation TITANUS TOP SENS Rev a 140 06 13 Figure 77 Connecting the TITANUS ...
Страница 148: ......
Страница 156: ...Installation of the pipe system TITANUS TOP SENS Rev a 156 06 13 Figure 88 Attaching the aspiration reducing film sheet ...
Страница 204: ......
Страница 206: ......
Страница 210: ......
Страница 216: ......
Страница 226: ......
Страница 240: ......
Страница 246: ...TITANUS TOP SENS Rev a Glossary TS_A_Glossar en e DOC Data 04 09 ...
Страница 247: ......
Страница 248: ......
Страница 249: ...TITANUS TOP SENS Rev a 06 13 205 ...
Страница 250: ...TITANUS TOP SENS Rev a ...