Super Finish 21 • 23
32
GB
Starting operation
4.4
cOnnectIOn tO tHe MAInS
Attention
The connection must take place through a
correctly earthed two-pole and-earth socket
outlet.
Before connection to the mains, pay attention to the fact that
the mains voltage agrees with the information on the makers’
name plate on the rear of the unit.
The green control lamp will light up as soon as the mains plug
has been connected.
4.5
cleAnInG preServInG AGent wHen
StartinG-up oF operation initially
1.
unit with suction system
Submerge suction pipe into a vessel filled with a suitable
cleaning agent.
2.
unit with upper hopper
Fill suitable cleaning agent into the upper hopper.
Switch on the unit.
3.
Turn the pressure regulation knob (fig. 11, item 1) to the
4.
right
as far as it will go.
Open the relief vale (2),
5.
valve position
(circulation).
Wait until cleaning agent comes out at the return hose.
6.
Close the relief valve, valce position
7.
(spraying).
Pull the trigger guard of the spray gun.
8.
Spray cleaning agent out of the unit into an open collection
9.
container.
2
1
4.6
Ventilate unit (hydraulic SyStem) iF the
SOund Of tHe Inlet vAlve IS nOt AudIBle
Switch on the unit.
1.
Turn pressure regulating knob (fig. 12, item 1)
2.
three
revolutions
to the
left
.
Open the relief valve (2), valve position
3.
(circulation).
The hydraulic system is ventilated. Leave the unit on for
two to three minutes.
Then turn the pressure regulating knob (1) to the
4.
right
until stop. Sound of the inlet valve is audible.
If not, repeat points 2 and 3.
5.
3
2
5
6
7
4
1
4.3
hiGh-preSSure hoSe and Spray Gun
Screw the high-pressure hose (fig. 10, item 1) onto the hose
1.
connection (2).
Screw the spray gun (3) with selected tip onto the high-
2.
pressure hose.
Tighten the union nut on high-pressure hose so that no
3.
coating material escapes.
3
1
2
Содержание Super Finish 21
Страница 111: ...109 Super Finish 21 23...