Waeco ADLER /BARBOUR SERIES Скачать руководство пользователя страница 13

Contents, specifications and availability are subject to change without notice.

Tel. (860) 664-4911 • Fax. (860) 664-4912 • www.waecousa.com    

WAECO USA, Inc. 

13

INSTALLING THE ANALOG (KNOB TYPE) THERMOSTAT

Mount the thermostatic control unit high in the icebox, away from
moisture and spillage. It should also be visible and accessible. It
is acceptable to mount the thermostatic control unit outside of
the icebox space if you prefer. At least 12” of capillary sensing
tube must be inside the box.

The capillary sensing tube is 36” long and must reach from the
thermostatic control unit to the clamping plate on the side of the
freezer unit. It must be routed along the icebox wall—clear of
food, shelving, etc.

The thermostat can be mounted by using either the adhesive
backing on the thermostat mounting flanges or the stainless steel
mounting screws (supplied).

If using the adhesive backing, the mounting area must be clean
and dry. Peel off the protective backing from the adhesive foam
on both mounting flanges of the thermostatic control unit,
position carefully and press firmly to adhere. 

We recommend that you also use the mounting screws by drilling
two 9/64” holes through the thermostat flange holes.

INSTALLATION PROCEDURE 

(see drawing below).

1. Carefully unroll just enough capillary tubing to reach the

metal and plastic clamp plates on the side of the freezer unit.
Via this tube, the thermostatic control unit “senses” the
temperature of the freezer unit. Bend the last 2 inches back
into a “J” shape. Slide the “J” shaped end between the metal
and plastic plates and fasten the screws firmly. 

Be sure that

four inches of tubing are clamped under the metal plate or
the thermostatic control unit will not function properly.

2. Secure the coil and tube against chafing. (Leave the excess

capillary tubing coiled). 

The tube must not touch the freezer

unit at any point except the clamp plates or an erratic control
cycle will result.

3. Uncoil the 21 foot electrical harness from the thermostat and

run it alongside the refrigerant tube set to the condensing
unit phone jack. Plug this harness into its mating receptacle
on the face of the junction box.

VertiCube™ Ice Cube Trays

Thermostatic Control

Plastic Plate

Metal Plate

FORMING & ATTACHING THE THERMOSTAT

SENSING TUBE TO THE EVAPORATOR

The sensing tube from the thermostat must

be formed into a 2-1/2” “J” and clamped

between the plastic plate and metal plate

Evaporator

USING THE

ICE TRAY SEPARATOR

The separator keeps the ice

cube trays in firm contact with

the cold evaporator.

Содержание ADLER /BARBOUR SERIES

Страница 1: ...e subject to change without notice Tel 860 664 4911 Fax 860 664 4912 www waecousa com WAECO USA Inc 1 WAECO USA Clinton CT www waecousa com Installation Operating Manual For ADLER BARBOUR SERIES ColdM...

Страница 2: ...Considerations 16 Water Cooled Optional Package Installation 17 Battery Recommendations 18 Wiring the System 18 Voltage Drops 19 Making the Power Connections 19 Wire Size and Wire Size Table 19 Wiring...

Страница 3: ...efficiency with minimal power consumption TERMINOLOGY Below are terms and definitions that will be used throughout this manual CONDENSING UNIT The stainless steel base plate mounted compressor electr...

Страница 4: ...ollowing points in mind when planning the installation GENERAL The connecting refrigerant tube set between the condensing unit and the freezer is 15 long 12 5 for PowerPlate Plan the location of the t...

Страница 5: ...ible location in the largest compartment available However many other locations are acceptable provided the appropriate ventilation duct kit is installed see below ENGINE COMPARTMENT DUCT KIT OR POWER...

Страница 6: ...TE The bracket may seem too light and flexible before it is mounted Once bolted securely to the bulkhead then use supplied bolts to secure the condensing unit base it becomes stabilized and very rigid...

Страница 7: ...You may need to install a manual damper over the hole to better control individual compartment temperatures This can be a simple disc with a single pivot screw As an alternative you can use the Adler...

Страница 8: ...up to 6 cubic feet with box insulation 4 or better 8 cubic feet with insulation of 6 or better REFRIGERATOR The standard small vertical or small horizontal evaporator is used for refrigerators up to...

Страница 9: ...keeps the tubing feeding smoothly without damaging it Be careful not to kink flatten or strain joints Make sure the plastic caps are in place over the refrigerant couplings Keep dirt out of the coupl...

Страница 10: ...he excess tubing and the thermostat wiring harness in an 18 to 24 diameter coil and secure preferably in a horizontal orientation Support the refrigerant tube set and the wire harness using clamps and...

Страница 11: ...away view of the male and female coupling halves being joined at 20 50 and 100 connection NOTE the way the cutter blades pierce the diaphragms and fold them back out of the flow path Also note the dif...

Страница 12: ...CW Clockwise the female until the coupling halves bottom out and strong resistance is felt THIS WILL REQUIRE ABOUT 6 FULL TURNS Work rapidly to minimize any possible escape of refrigerant past the tem...

Страница 13: ...hrough the thermostat flange holes INSTALLATION PROCEDURE see drawing below 1 Carefully unroll just enough capillary tubing to reach the metal and plastic clamp plates on the side of the freezer unit...

Страница 14: ...rovided MOUNTING THE TEMPERATURE SENSING BULB 1 Run the sensing bulb and wire into the refrigerated box to be controlled Mount the sensing bulb on a box side wall midway between top and bottom using t...

Страница 15: ...d now Do not allow any dirt sawdust foam insulation dust etc to get into couplings ends as this will seriously damage the system These couplings are different from the couplings that join the tube set...

Страница 16: ...he switch panel provided with this option note that the built in fan and the Powerduct fan if fitted continues to run This ensures a flow of air over the compressor to keep it relatively cool and is n...

Страница 17: ...d that the seacock is at least 2 below the waterline 5 Inlet thruhull must have a scoop facing forward on the outside of the hull to prevent back siphoning At high sailing speeds the flow direction ma...

Страница 18: ...a battery constructed to provide small to moderate currents for long periods of time as opposed to short bursts of high current to start engines While deep cycle batteries start engines quite satisfa...

Страница 19: ...breaker to prevent voltage drops in the supply circuit to the ColdMachine Also do not install voltage dropping devices such as indicator lights volt and amp meters etc in the 12 volt DC wiring circui...

Страница 20: ...20 WAECO USA Inc Tel 860 664 4911 Fax 860 664 4912 www waecousa com Contents specifications and availability are subject to change without notice...

Страница 21: ...Contents specifications and availability are subject to change without notice Tel 860 664 4911 Fax 860 664 4912 www waecousa com WAECO USA Inc 21...

Страница 22: ...22 WAECO USA Inc Tel 860 664 4911 Fax 860 664 4912 www waecousa com Contents specifications and availability are subject to change without notice...

Страница 23: ...Contents specifications and availability are subject to change without notice Tel 860 664 4911 Fax 860 664 4912 www waecousa com WAECO USA Inc 23...

Страница 24: ...thick frost formation is an indication of moist outside air entering through a poorly sealed lid doors or liner joints These conditions must be eliminated for proper performance The best way to defro...

Страница 25: ...at Do not set a positive differential Do not set a differential of 0 zero HIGH LOW SET POINT LIMITS HI LO Allow you to limit the range at which temperature set points can be programmed This is factory...

Страница 26: ...E FLASHING LED ON THE CONDENSING UNIT If the electronic module senses a malfunction it will auto matically switch into its protective mode and will make repeated start attempts at about 1 minute inter...

Страница 27: ...ressures Shut off power wait 15 minutes not yet equalized restore power Faulty electronic module Replace electronic module 3 Faulty compressor Call factory 5 Excessively hot electronic module Improve...

Страница 28: ...ing sleeve Partial clog in refrigerant circuit Call WAECO USA 860 664 4911 only part of the evaporator is frosting 3 Box insulation is inadequate or Re insulate Contact local dealer box too large for...

Страница 29: ...rtition between well insulated evaporator and perishable food section Thermostat sensing bulb not See manual correct mounted correctly Water pump runs no water flow Air in pump cannot self purge Check...

Страница 30: ...fins are soft and thin for maximum efficiency PROCEDURE FOR REMOVING EVAPORATOR AND TUBE SET 1 Turn the thermostatic control to OFF 2 Disconnect the 12V DC power supply to the compressor unit Carefull...

Страница 31: ...also have other rights which vary from State to State THERE ARE NO OTHER WARRANTIES OF MERCHANTABILITY FITNESS FOR PURPOSE OR ANY OTHER KIND ANY EXPRESSED OR IMPLIED ARE HEREBY DISCLAIMED AND EXCLUDED...

Страница 32: ...WAECO USA Inc P O Box 497 8 Heritage Park Road Clinton CT 06413 Tel 860 664 4911 Fax 860 664 4912 www waecousa com...

Отзывы: