Putting the machine back into operation
Information
If the machine was decommissioned over a longer period of time without
performing the specified steps, contact a Wacker Neuson service center
before putting the machine back into operation.
1. Remove anticorrosion agents from bare metal parts.
2. Install and connect the battery.
3. Open the air-intake openings of the air filter system and exhaust pipe.
4. Check the condition of the air filter elements and replace the elements
if necessary.
5. Check the dust valve.
6. Set the fuel cock to
ON
.
7. Turn the starting key to position
1
for 2 minutes to supply the engine
with fuel.
8. Check the machine for leaks.
9. Lubricate the machine according to the lubrication plan.
10.Check all engine/machine fluids in the units or tanks, and add fluids if
necessary.
11.If the machine was out of service for over 6 months, change the oil in
the gearbox, engine, hydraulic oil reservoir and other units.
12.Replace the hydraulic oil filters (return and breather filters) if the
machine was out of service for over 6 months.
13.Remove and keep the starting key and fuse
F1
in a safe place.
14.Insert the starting key and make the engine turn 15 seconds.
15.Wait 15 seconds.
16.Make the engine turn another 15 seconds.
17.Remove the starting key and put fuse
F1
back in.
18.Start the engine.
19.Let the engine run at idling speed at least 15 minutes without load.
20.Check the oil levels in all units and add oil if necessary.
21.Check the machine for leaks.
22.Avoid operation at maximum engine speed or load for more than an hour.
Start the machine and ensure that all functions and warning systems work
correctly before putting the machine back into operation.
Содержание EZ17
Страница 12: ...1 6 OM EZ17 us 1 0 ez17v100 fm 1 Notes...
Страница 38: ...3 10 OM EZ17 us 1 0 ez17e300 fm 3 Warning labels Fig 11 symbolic representation...
Страница 43: ...OM EZ17 us 1 0 ez17e300 fm 3 15 3 Labels Fig 24 symbolic representation...
Страница 48: ...3 20 OM EZ17 us 1 0 ez17e300 fm 3 Notes...
Страница 66: ...4 18 OM EZ17 us 1 0 ez17i400 fm 4 Socket The machine is equpped with a 12 V socket on the right Fig 66...
Страница 138: ...5 56 OM EZ17 us 1 0 ez17b510 fm 5 Notes...
Страница 146: ...6 8 OM EZ17 us 1 0 ez17t600 fm 6...
Страница 198: ...7 52 OM EZ17 us 1 0 ez17w710 fm 7 Notes...
Страница 202: ...8 4 OM EZ17 us 1 0 ez17b800 fm 8 Notes...
Страница 222: ...9 20 OM EZ17 us 1 0 ez17t900 fm 9 Dimensions Overview EZ17 Fig 227...
Страница 224: ...9 22 OM EZ17 us 1 0 ez17t900 fm 9 Notes...