VWR
Puranity TU+ |
39
Initial start up
Putting the system into operation
NOTE!
The system must warmed up or cooled down to room temperature before being put into
operation.
CAUTION
Check that all connections have been made as described in Chapter 7 “Installation” on
page 21 or shown in the bottom diagram.
1. Concentrate connector for outer diameter 1/4“ tube
2. Feedwater connector for outer diameter 1/4“ tube
3. Tank overflow connector for outer diameter 1/4“ tube
4. Tank back flow connector for outer diameter 1/4“ tube
5. Tank flow connector for outer diameter 1/4“ tube
6. Concentrate connector for outer diameter 1/4“ tube
7. Feedwater connector for outer diameter 1/4“ tube
1
2
3
Connections Puranity TU 3+/6+
Connections Puranity TU 12+
4
5
6
7
Содержание Puranity TU 12 UV+
Страница 6: ...vi Puranity TU VWR...
Страница 18: ...Extend of delivery 10 Puranity TU VWR Chapter 3...
Страница 20: ...Intended use of the device 12 Puranity TU VWR Chapter 4...
Страница 29: ...VWR Puranity TU 21 Installation Connections of the Puranity TU 3 6 system 12 11 10 9 8 7 6 1 2 3 4 5...
Страница 44: ...Flow chart 36 Puranity TU VWR Chapter 8...
Страница 46: ...How the Puranity TU system functions 38 Puranity TU VWR Chapter 9...
Страница 72: ...Equipment disposal 64 Puranity TU VWR Chapter 14...
Страница 76: ...Consumables 68 Puranity TU VWR Chapter 16...
Страница 77: ...VWR Puranity TU 69 Terminal assignment...
Страница 78: ...Terminal assignment 70 Puranity TU VWR Chapter 17...
Страница 80: ...Maintenance record 72 Puranity TU VWR Chapter 18...
Страница 84: ...76 Puranity TU VWR Index...